An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. R7.1: UI ConnectivityAn update EDS 3 Release 7 (CRR) February 8th, 2008

  2. Table of contents Status of R7.1 activity (*reminder: leave uploaded portfolios) Early wrap-up of R7.1 General issues encountered

  3. Status of R7.1 activity See R7 status report for full details (available on eds 3 website and meeting page) • Number of participants who completed R7.1 = 14 (23%) • Number of participants who started* R7.1 = 24 (39%) (as of end of day Thursday) Participants yet to start: AEP Energy Partners, Inc. Air Liquide Large Industries US LP American Electric Power Service Corporation ANP Funding I LLC Bank of America NA BP Brazos Electric Power Co Op Inc. Bryan Texas Utilities CALPINE ENERGY SERVICES LP Citi Commerce Energy, Inc. ConocoPhillips Desert Sky Wind Farm EPIC Merchant Energy TX LLC • Reminder: Please ensure that the last person who uploads the bid file leaves it uploaded. If the bid file is uploaded then deleted/removed, the activity cannot be considered complete. FPL Energy Pecos Wind I, LP FPL Energy Pecos Wind II, LP FPL Energy Upton Wind I, LP FPL Energy Upton Wind II, LP FPL Energy Upton Wind III, LP FPL Energy Upton Wind IV, LP GEUS Goldman Sachs Indian Mesa Wind Farm, LP (LCRA) Indian Mesa Wind Farm, LP (TXU) Integrys Energy Services, Inc. IPA Marketing Inc. Keystone Energy Partners LP Morgan Stanley Capital Croup Inc. Sempra Energy Solutions LLC Star Electricity, LLC dba StarTex Power Strategic Energy, LLC dba Expert Energy Stream Energy Suez Energy Resources NA, Inc. TARA ENERGY INC. Tenaska Power Service Co. TEX-LA ELECTRIC COOPERATIVE OF TEXAS INC Trent Wind Farm West Texas Wind Energy Partners, LP

  4. Early wrap-up of R7.1 • Based on the progress of R7.1 activity, we project an early completion of the planned testing activity and plan to get an early start on subsequent EDS preparatory activities. • The last day to complete any outstanding R7.1 activity is Weds 2/13/08 • If you had planned on completing R7.1 testing after the above-mentioned date and are not available to reschedule it earlier, please email crrinfo@ercot.com to let us know by today Further information: • A day is allocated in R7.2 to catch-up on any R7.1 activity (mentioned in CRR handbook) • R7.2 is starting as scheduled on 2/18/08 • Part of the “subsequent EDS preparatory activities” includes taking the system down to reconfigure the application server to its appropriate database No market call, continue with R7.1 activities

  5. General issues encountered so far • 404 or 500 error page while saving/navigating in auction portfolios • Confusion regarding drag-drop of source sinks • Confusion regarding steps described in scripts • Only one new defect raised regarding typed-in date format Low severity and priority Look for messages from CRR Operator We’ll be using them to publish frequently encountered issues going forward

  6. Coming up - R7.2: fully structured mock monthly allocation/auction Objective • ERCOT conducts mock monthly allocation (NOIEs submit ERCOT-provided nominations) • ERCOT conducts mock monthly auction (CRR AHs submit ERCOT-provided bids and offers) • CRR AHs bilaterally trade CRRs as orchestrated by ERCOT Exit Criteria • Resolved all participant-reported issues regarding any of the following: • Upload of the bid/offer portfolios provided by ERCOT (in either XML or CSV) • Download of auction results • Initiation and/or acceptance (as orchestrated by ERCOT) of bilateral trades • If eligible NOIE – upload of nomination information provided by ERCOT • If eligible NOIE – download of allocation results • If CP – entering of credit limit assigned to market provided by ERCOT