Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter 3
Purpose of a Site Survey • Documents existing network structure • Shows physical layout to determine if new equipment can be installed • Will also help show . . . • What is already on site • What type of equipment may be needed • Floor plan of structure • Determine obvious issues • Unlabeled cables • Poor physical security • Lack of power • Lack of UPS
Perform a Customer Site Survey • What does the technician look for . . . • Number of hosts or users • how many will be added over the next 12 months • how many network servers and/or printers are needed • Internet Service and Equipment • if upgrading speed, may need to upgrade equipment • Existing network devices • type of network equipment installed • configurations loaded on devices • Security • are additional firewalls needed • Applications • VoIP or video conferencing • Wireless or Wired • amount of square feet between access points
Determine the Topologies • Physical topology • actual physical layout of devices • Logical topology • documents what paths are taken through the network • includes: • IP addresses • device names • workstations • routers • servers
Perform a Customer Site Survey • Documentation on current hosts and devices • Includes: • device name • location • brand and/or model • operating system • IP addressing • connectivity method • security
Coming up with a Game Plan • A good plan will help identify the following: • Strengths • Weaknesses • Opportunities • Threats • AKA SWOT
Phases of the Network Upgrade • Requirements Gathering • analyze data from on-site visit to determine network requirements • done by the design team • creates Analysis Report • Selection and Design • selection of devices & cabling • weaknesses of design are identified and addressed here • creation of a prototype • Implementation • overlooked tasks are corrected • constant customer communication is CRITICAL • Operation • Review and Evaluation
Examining the Physical Environment • Examine existing facilities and existing cabling • Find MDF (Main Distribution Facility) • houses network devices • all network cable concentrate here • may also contain POP of ISP • Any IDFs? (Intermediate Distribution Facility) • additional wiring closets • connect to MDF
Cabling Considerations • Check cable types needed • STP • UTP • Coaxial • Fiber • Check cable specifications • Straight Through • Crossover • Rollover • Serial • TIA/EIA 568A/568B standard
Check Out the Cabling • Patch Cable • from PC to wall plate • Horizontal cable • from wall plate to IDF • Vertical cable • from IDF to MDF • Backbone cable • handles major traffic • Wiring closet location • Cable management system • protects cables/cable runs • Cable labeling • Electrical
Purchasing Equipment for the Network • Managed services • equipment obtained from ISP through a lease • all updates, maintenance, etc. of equipment are the responsibility of the ISP • In-house services • all responsibility falls on the customer
Selection of Network Devices • Selection of LAN devices • hubs could be used with smaller LANs • switches more efficient • managed switch – control over individual ports • which is better? (one 24 port switch or 2-12 port switches) • Selection of a WAN device (router) • fixed or modular expansion? • fixed – specific number/type of ports • modular – includes expansion slots • breaks up collision and broadcast domains
Cisco Devices • Router • 1841 ISR (Integrated Services Router) • used for medium-sized business • different connectivity options • Switch • 2960 switch • used for Fast Ethernet and Gigabit connectivity
Network Reliability and Availability • Reliability • can be achieved by adding redundancy to the network • use of two routers instead of one • Five-9’s of availability • network operational 99.999% of time • Use of fault tolerance helps to ensure reliability • a network will continue operating properly in the event of a failure • Use of the following devices will help ensure fault tolerance • UPS • multiple power supplies • hot-swappable devices
IP Addressing Plan • The following devices will need IP addresses • user PCs • servers • printers, IP phones • router LAN interfaces • router WAN (serial interfaces)
Summary • A site survey including extensive documentation of both physical and logical network information must be performed before a network upgrade can be planned. • The five phases of a network upgrade include requirements gathering, selection and design, implementation, operation, and review and evaluation. • Structured cabling deals with the placement of cables, location of wiring closets, cable management, and electrical considerations. • Cost and expandability are important considerations when planning equipment upgrades.