1 / 14

The Game Plan for Loran-C Modernization

The Game Plan for Loran-C Modernization. John J. Macaluso U. S. Coast Guard Mitchell J. Narins U. S. Federal Aviation Administration International Loran Association Boulder, Colorado November 4, 2003. Introduction. Purpose of Loran-C Modernization Overall Enhanced-Loran Context

chapa
Download Presentation

The Game Plan for Loran-C Modernization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Game Plan for Loran-C Modernization John J. MacalusoU. S. Coast Guard Mitchell J. NarinsU. S. Federal Aviation Administration International Loran Association Boulder, Colorado November 4, 2003

  2. Introduction • Purpose of Loran-C Modernization • Overall Enhanced-Loran Context • Loran Recapitalization Project • Status • Plans (Order of Lorsta Conversion) • Modernized Coverage in 2004

  3. Purpose of Loran-C Modernization • GPS and GPS augmentation services • Volpe Vulnerability Study, 1998-2001 • Timing, multimodal transportation • Intentional and unintentional interference • Consequences of loss of GPS • Mitigation strategies & technologies • Loran-C has potential as GPS back-up

  4. Potential of Loran-C • Loran-C and GPS are complementary • Both provide timing, positioning & nav info • GPS is worldwide • Loran-C operates where concerns are greatest • Different strengths & weaknesses • Loran-C requires modernization

  5. “Enhanced Loran” • Antenna technology • Blink • Communications using the Loran signal • Differential Loran • Early skywave & other integrity issues • Time-of-Transmission Control • Calibration of Loran System • Loran Recapitalization Project

  6. Loran Recapitalization Project • 24 Coast Guard-operated Lorstas • CONUS & Alaska Lorstas operating • Vacuum-tube transmitters (TTX) • Solid State transmitters (Legacy-SSX) • Control & Monitoring System (LCCS) • New Equipment • Solid State Transmitter (NSSX) • Timing & Frequency Equipment (TFE) • Control & Monitoring Equipment (NLCCS)

  7. Paths to Modernization • Legacy-SSX Lorsta Conversion (13 each) • Install new TFE & integrate with Legacy SSX • Vacuum-tube Lorsta Conversion (11 each) • Construct new transmitter building • Build/install new transmitter (NSSX) • Install new TFE • Control Station (2 each) • Install new LCCS at Navcen East & West

  8. First Modernized Lorsta • Lorsta George, WA • Vacuum-tube transmitter • Converted to NSSX on 23 Oct 2003 • Casualty - reverted to TTX on 29 Oct 2003 • Troubleshooting currently underway • Signal can be monitored by NIST, TSC • Involves Canadian government early

  9. Expected Coverage of Lorsta George

  10. Coverage Adding Dana, Seneca, Baudette

  11. Coverage Adding Malone & Boise City

  12. Chain-by-Chain Conversion • Great Lakes Chain (GLKS) • US West Coast Chain (USWC) • Northeast US Chain (NEUS) • Southeast US Chain (SEUS) • South Central US Chain (SOCUS) • North Central US Chain (NOCUS) • Gulf of Alaska Chain (GOA) • North Pacific Chain (NORPAC)

  13. Conclusion • Lorsta George – First converted Lorsta • GLKS – First converted Loran chain • Chain-by-chain conversion • CONUS Lorstas • Alaskan Lorstas • Several other “Enhanced Loran” initiatives • Loran-C positioned to serve the nation

  14. Questions John J. MacalusoUSCG Loran Support Unit (609)523-7248 Mitchell J. NarinsU. S. Federal Aviation Administration (202)493-4336

More Related