Update on project on audit quality control - ISSAI 40 Greg Schollum Project Chair (SAI New Zealand) June 2009. Image here. Purpose of the project. Develop overall code for audit quality within SAIs (ISSAI 40).

Download Presentation

Image here

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on project on audit quality control- ISSAI 40 Greg Schollum Project Chair (SAI New Zealand)June 2009 Intosai PSC Steering Committee Image here

  2. Intosai PSC Steering Committee Purpose of the project • Develop overall code for audit quality within SAIs (ISSAI 40). • Part of level 2 of ISSAI framework (“prerequisites for the functioning of SAIs”). • Aiming for endorsement at INCOSAI 2010.

  3. Intosai PSC Steering Committee Background • Terms of reference for the project approved in Beijing (October 2008): • “Dual approach” endorsed; • Support for guidance in ISSAI 40 to complement work of FAS, CAS, PAS; • Suggested additions to project team, including observer from IAASB staff.

  4. Intosai PSC Steering Committee Project team • Greg Schollum – SAI New Zealand (Project Chair) • Andrew Baigent – SAI United Kingdom (representing FAS) • Therese Johnsen – SAI Norway (representing PAS) • Jesús Lázaro Cuenca – European Court of Auditors (representing FAS) • A K Thakur – SAI India (representing CAS) • Mary Riopelle – SAI Canada • Dr Josef Moser – SAI Austrian Court of Audit • Michael Nugent – IAASB staff (Observer)

  5. Intosai PSC Steering Committee Progress to date • Draft ISSAI 40 prepared. • Currently based on ‘companion’ approach. • Project team meeting planned for September 2009 in London.

  6. Intosai PSC Steering Committee Issues on which the views of the PSC Steering Committee are sought • ‘Companion’ or ‘integrated’ approach? • Overlap with part 1 of ISSAI 200: • Potential withdrawal of ISSAI 200 in due course? • Any comments on the material within ISSAI 40?

  7. Intosai PSC Steering Committee Questions / points of clarification