1 / 33

Metro Boston Stormwater / Low Impact Development Capacity Building Project

Metro Boston Stormwater / Low Impact Development Capacity Building Project. Lexington & Wakefield 1 st Workshop - February 7, 2007 Wakefield Town Hall. Slide show prepared by: Metropolitan Area Planning Council. With funding provided by Massachusetts Office of Coastal Zone Management.

chars
Download Presentation

Metro Boston Stormwater / Low Impact Development Capacity Building Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Metro Boston Stormwater / Low Impact Development Capacity Building Project Lexington & Wakefield 1st Workshop - February 7, 2007 Wakefield Town Hall Slide show prepared by: Metropolitan Area Planning Council With funding provided by Massachusetts Office of Coastal Zone Management

  2. Reasons for Stormwater Management:IMPACT OF DEVELOPMENT Typical pre-development conditions: Runoff = 10% Infiltration = 50%

  3. Reasons for Stormwater Management:IMPACT OF DEVELOPMENT Typical post-development conditions: Runoff = 55% Infiltration = 15%

  4. Reasons for Stormwater Management: • Stormwater quality • Stormwater quantity – flooding • Groundwater – recharge • National Pollution Discharge Elimination System (NPDES) requirements

  5. STORMWATER MANAGEMENT POLICY • Clean Water Act (CWA) – Phase II • National Pollution Discharge Elimination System (NPDES) - Phase II Objectives

  6. STORMWATER MANAGEMENT PROGRAM(Phase II): • Public Education & Outreach • Public Involvement • Illicit Discharge Detection & Elimination • Construction Site Stormwater Runoff Control • Post Construction Stormwater Management For New Development and Redevelopment • Pollution Prevention / Good Housekeeping For Municipal Operations

  7. STORMWATER MANAGEMENT PROGRAM(Phase II): • Zoning, subdivision, site plan review, and other existing permitting processes • Stormwater bylaws / ordinances and regulations • Inspection and enforcement activities • System inventory / mapping • Operations and maintenance • Capital projects • Project administration • Funding (e.g. Stormwater Utility)

  8. What isLow Impact Development? • Comprehensive, landscape-based approach to sustainable development • Set of strategies to maintain existing natural systems, hydrology, ecology • Cost-effective, flexible approach based on a toolkit of simple techniques • Collection of practices that have been implemented nationwide

  9. What isLow Impact Development? • NOT rocket science • NOT formulaic • NOT the answer to every challenge • NOT yet finished evolving • NOT common in Massachusetts

  10. WHY DO WE NEED LOW IMPACT DEVELOPMENT?Conventional strategies aren’t working • Increased runoff & decreased recharge • Loss of vegetation and wildlife habitat • Loss of community character • Polluted waterways • Cost of development

  11. LID PRINCIPLES • Work with the existing landscape • Focus on prevention • Practice micromanagement • Emphasize simplicity • Practice multi-tasking • Maintain and sustain

  12. LID PRINCIPLES1. Use existing natural systems as the integrating framework for site planning • Land use planning and watershed planning • Identify environmentally sensitive resources: wetlands, mature trees, slopes, drainageways, permeable soils, waterway buffers • Assess existing hydrology • Define a development envelope

  13. LID PRINCIPLES2. Focus on prevention • Minimize clearing and grading • Cluster buildings and reduce building footprints • Reduce road widths, use shared driveways, reduce parking area • Align roads to minimize impact • Use green rooftops • Use permeable paving

  14. LID PRINCIPLES3. Treat stormwater close to the source • Create subwatersheds and “micromanage” runoff in a treatment train of small structures • Flatten slopes, lengthen flow paths, maximize sheet flow • Maintain natural flow paths, use open drainage • Use LID techniques to manage frequent, low-intensity storms

  15. LID PRINCIPLES4. Emphasize simple, nonstructural, low-tech, low-cost methods • Open drainage systems and filter strips • Disconnection of roof runoff • Rain barrels • Street sweeping • Public education • Reduce construction disturbance • Minimize lawn area

  16. LID PRINCIPLES5. Create a multifunctional landscape • Use stormwater management components that provide filtration, treatment, and infiltration. • Provide open space and wildlife habitat. • Store water for landscape use • Reduce heat island effect • Enhance site aesthetics

  17. LID PRINCIPLES6. Maintain and sustain • Reduce use of pesticides and fertilizers. • Use drought-resistant plants. • Maintain rain gardens and bioretention areas. • Provide adequate funding for public works departments

  18. LID STRATEGIES • Low impact site design • Stormwater Management • Buildings and Roadways • Roadways and Parking Areas • Permeable paving • Bioretention • Vegetated Swales • Rain Barrels and Cisterns • Green Roof Systems

  19. LID STRATEGIESLow Impact Site Design • Conservation of natural hydrology, trees, vegetation • Stream & wetland buffers • Minimize impervious surfaces • Stormwater micromanagement • Ecological landscaping Conservation Typical Subdivision

  20. LID STRATEGIESLow Impact Site Design Stormwater Management • Minimize directly connected impervious area • Create multiple sub-watersheds • Increase time of concentration • Use a “treatment train” of LID techniques to deal with frequent, low-intensity storms.

  21. LID STRATEGIESLow Impact Site Design Buildings and Roadways • Cluster buildings within the development envelope • Design buildings with smaller footprints • Roadways should follow existing grades. • Use parking structures • Separate parking areas

  22. LID STRATEGIESRoadways and Parking Areas Road Profile • Narrower roadways (18-24 feet) • Permeable parking lanes • Open section roadways • Alternative curb designs

  23. LID STRATEGIESRoadways and Parking Areas Alternative Turnarounds • Smaller cul-de-sacs • Bioretention islands • One-way-loops • Hammerhead turnarounds

  24. LID STRATEGIESRoadways and Parking Areas Parking Lots • Create multiple small lots • Allow shared parking • Reduce requirements near transit • Require compact spaces • Set parking maximums

  25. LID STRATEGIESPermeable Paving Applications • Parking stalls • Overflow parking • Driveways • Walkways and plazas

  26. LID STRATEGIESBioretention Treatment, retention, infiltration, landscaping • Excavation filled with engineered soil mix • Herbaceous perennials, shrubs, trees • Ponded water infiltrates within 72 hours • Overflow outlet and optional underdrain

  27. LID STRATEGIESBioretention Applications • Parking lot islands • Median strips • Rooftop runoff

  28. LID STRATEGIESVegetated Swales Conveyance, treatment, infiltration • Roadside swales “country drainage” • Parking lots • Low-angle slopes only • Opportunity for snow storage

  29. LID STRATEGIESVegetated Swales Conveyance, treatment, infiltration

  30. LID STRATEGIESRain Barrels and Cisterns Runoff Reduction and Water Conservation • Downspouts directed to tanks or barrels • 50 – 50,000 gallons • Excess diverted to drywell or rain garden • Landscaping, car washing, other nonpotable uses

  31. LID STRATEGIESRain Barrels and Cisterns Runoff Reduction and Water Conservation

  32. LID STRATEGIESGreen Roof Systems Runoff Reduction, Reduce Heating/Cooling Costs • Rainwater stored in a lightweight engineered soil medium • Hardy, drought-resistant vegetation • Reduce runoff by 50% • Not for use in stressed basins

  33. LID STRATEGIESGreen Roof Systems Applications

More Related