An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NATIONAL HYDROLOGY PROJECT 1stWorld Bank Mission Status & Progress of Goa

  2. Details of SPMU (in position), Staff Strength etc • SPMU established in WRD Complex, Gogol, Margao • Staff Strength – 3 Nos • Shri R.B. Ghanti, Superintending Engineer • Shri Ravishankar S Godi, Assistant Surveyor of Works

  3. Funds Received (2016-17), (2017-18) & expenditure till date Year wise • Goa could not open a savings bank account. Hence funds were not allotted in Fin Year 2016-17. • Goa opened a savings bank account in State Bank of India and registered in PFMS on 12/07/2017. • Goa is awaiting allotment of funds in Fin Year 2017-18

  4. Major Procurement item in PIP (Item Code, Item and amount)

  5. Major procurement item in AWP 2016-17 & their Status (Item Code, Item and amount)

  6. Major procurement item in AWP 2017-18 & other state (Item Code, Item and amount)

  7. Physical Progress – Completed, Process underway, Proposed • Department Land for construction of Centre of Excellence is identified at Dhargal, Pernem Taluka, Goa. • Details for center of excellence is awaited, after which the estimate & bid document will be prepared.

  8. Status of Bid Document – Floated, Ready to be floated, Under Preparation • Details for preparation of estimate & bid document for RT-DAS at Tillari Canal is underway.

  9. Status of various Studies / PDS etc. Purpose Driven Studies • Dam Break analysis and preparation of Emergency Action Plan for Medium and Major Dams in Goa • Simulating bathymetric changes in reservoirs due to sedimentation: Application to Dams of Goa • Both the proposals have been submitted to Shri C.P. Kumar, PDS Coordinator, NIH Roorkee. The second proposal is returned with observations which is being resubmitted. • Terms of Reference for Consultancy for Fact finding and planning study on coastal issues is submitted to NPMU & WB on 03/08/2017 for approval. • Terms of Reference for appointment of Individual Consultant - Senior Environmental and GIS consultant & Senior Coastal Modeller in SPMU is submitted to NPMU & WB on 09/08/2017 for approval.

  10. Status of Data entry in E-SWIS • Officers for training in E-SWIS will be sent after which the data entry will be started.

  11. Status of Hydromet Station (Both GW & SW), Reconciliation with state, CGWB, CWC, IMD etc. Hydro-meteorological stations (Surface Water ) • At present, it is felt that there is no need for more Gauge Discharge stations other than established under HP II. In future as per need, the details will be submitted to the committee & after approval new Hydro-meteorological stations (Surface Water ) will be established Hydro-meteorological stations (Ground Water ) • The Senior Hydro geologist of the Department has retired from Service . After the ground water network is finalised for additional sites, the details will be  submitted to the committee & after approval new Hydro-meteorological stations (Ground Water ) will be established. Hydro-meteorological stations (Meteorology) • List of hydro-meteorological stations (Weather station/ rain gauge station) is submitted to Superintending Engineer, Krishna Coordination Circle Hyderabad for placing before the committee for approval.

  12. Status Public Finance Management System (PFMS), • Goa opened a savings bank account in State Bank of India and registered in PFMS on 12/07/2017. • Goa is awaiting allotment of funds in Fin Year 2017-18

  13. Thank You