1 / 36

SuperB

SuperB.     . US Participation in the INFN Super Flavor Factory. David Hitlin P5 Meeting - SLAC February 21, 2008. The physics objectives of Super B. Requires a polarized electron beam.

Download Presentation

SuperB

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SuperB  US Participation in the INFN Super Flavor Factory David Hitlin P5 Meeting - SLAC February 21, 2008

  2. The physics objectives of SuperB Requires a polarized electron beam There are, of course, a very large number of other measurements in weak decay flavor physics and in QCD that can be made for the first time or greatly improved • To study rare t, b and c decays with sufficientsensitivity to isolate evidence for physicsbeyond the Standard Model • Find charged lepton flavor violation in t decays and study it • Search for CP violation in t production and decay andmeasure the t anomalous magnetic moment • Precisely measure CP-violating asymmetries in penguin-dominated B decays to search for new physics effects • Measure x and y in mixing, and search for CP violation • Search for new physics effects on branching fractions and kinematic distributions in rare decay processes David Hitlin P5 Meeting - SLAC February 21, 2008 2

  3. David Hitlin P5 Meeting - SLAC February 21, 2008

  4. A conversation between SuperB, LHC and ILC • When evidence is found for New Physics at the LHC, attention will turn to understanding the details • Is it SUSY? What type of symmetry breaking? • Is it extra dimensions? Are they warped? • The ILC will eventually sharpen the picture by, for example, measuring slepton masses • SuperB will be crucial to an understanding of the flavor sector of any type of new physics • Is there charged lepton flavor violation? • Are there new CP phases ? • Is there a charged Higgs ? • Is there minimal flavor violation in the (s)quark sector? David Hitlin P5 Meeting - SLAC February 21, 2008

  5. Lepton flavor violation (LFV) • Lepton flavor violation is unobservably small in the Standard Model • Neutrino mixing proves that there is neutral LFV • The next natural question is whether there ischarged LFV? • Will the neutrino pattern be repeated? • If so, then LFV will be largest in 32 transitions • Best bets: David Hitlin P5 Meeting - SLAC February 21, 2008

  6. Charged lepton flavor violation in t decays SuperBsensitivity For 75 ab-1 David Hitlin P5 Meeting - SLAC February 21, 2008

  7. Sensitivity to models of LFV Goto, et al. arXiv:0711.2935v2 David Hitlin P5 Meeting - SLAC February 21, 2008

  8. Polarized t’s can probe the chiral structure of LFV Flipping the helicity of the polarizedelectron beam allows us to determine the chiral structureof dimension 6 four fermionlepton flavor-violating couplings Dassinger, Feldmann, Mannel, and Turczyk JHEP 0710:039,2007; [See also Matsuzaki and SandaarXiv:0711.0792 [hep-ph] David Hitlin SLUO Meeting February 7, 2008

  9. Polarization at SuperB • The SuperB design includes a polarized electron beam • SuperKEKB does not, and cannot, have a polarized beam • Spins must be vertical in the ring  spin rotators at the IP • Solenoid spin rotators appear best • 36.6 Tesla-meters for 90 spin rotation in the LER e.g. 2.5 Tesla x14.66 meters with 30x106 ampere-turns • Expected longitudinal polarization at the IP: 87%(injection) x 97%(ring)=85%(effective) David Hitlin P5 Meeting - SLAC February 21, 2008

  10. New CP-violating phases in penguin modes SuperB LHC squark mass matrix (d sector) g ~ W-H--0 g, ~ ~ ~ ~ ~ ~ b u,c,t s b u,c,t s b u,c,t s b d,s,b s David Hitlin P5 Meeting - SLAC February 21, 2008

  11. Sensitivity extends to high mass scales New Physics contribution (2-3 transition) ~ MSSM + generic softSUSY breaking terms g In the red regions the d are measured with a significance >3s away from zero ~ ~ b s s b 1 10-1 10-2 In this case the main constraints are bsg = (0.026 ± 0.005) ACP(bsg)) Arg(d23)LR=(44.5± 2.6)o 1 10 1 TeV ACP magenta B(sg) green B(sll) cyan All constr. blue David Hitlin P5 Meeting - SLAC February 21, 2008

  12. The pattern of deviations from SM values is diagnostic David Hitlin P5 Meeting - SLAC February 21, 2008

  13. How do you gather the data sample? y • Access to new physics effects in the flavor sector requires a datasample 100x the total existing BABAR + Belle sample and therefore an asymmetric e+e-collider with ~100x current luminosity • There are at least two different approaches: • Increase the current and number of bunches: SuperPEP-II, SuperKEKB • High bunch charge, small b, coherent synchrotron radiation, heating, background and total power issues • Decrease the emittance and beam size at the IP: SuperB • Low emittance rings, à la ILC damping rings,with collisions of strongly focused beams at the IP with a large Piwinski angle David Hitlin P5 Meeting - SLAC February 21, 2008

  14. The SuperB approach to high luminosity – P. Raimondi • Low emittance rings, à la ILC damping rings • Focus the beams strongly at the IP with a large Piwinski angle • Beam current and wallplug power < PEP-II • Ultra-low emittance – achieved at ATF2 • Very small band spot sizes at the IP – demag achieved at FFTB • Large crossing angle – achieved at KEKB • “Crab Waist” scheme – being tested at DAfNE now • Small collision area • Can achieve lowerb • No parasitic crossings • Reduce effect of synchrobetatron resonances due to crossing angle David Hitlin P5 Meeting - SLAC February 21, 2008

  15. Comparison of SuperB and SuperKEKB IP beam distributions forSuperB IP beam distributions for SuperKEKB David Hitlin P5 Meeting - SLAC February 21, 2008

  16. SuperB luminosity profile Peak luminosity can beupgraded to 2.5x1036(conservatively) Peak Integrated 160 ab-1 in ten years ~100 x combinedBABAR+Belle data sample David Hitlin P5 Meeting - SLAC February 21, 2008

  17. An upgrade of BABAR works well at SuperB Since currents are in the PEP-II range, a detector upgrade is straightforward - R&D on SuperB upgrade components is underway David Hitlin P5 Meeting - SLAC February 21, 2008

  18. The SuperB location on the Tor Vergata campus DAfNE David Hitlin P5 Meeting - SLAC February 21, 2008

  19. 100m SuperB footprint at Tor Vergata SuperB Ring ( circumference 1800m) SPARX FEL SuperB Injector (~ 400m) Roman Villa SuperB Main Building David Hitlin P5 Meeting - SLAC February 21, 2008

  20. SuperB uses many PEP-II components Quadrupoles Dipoles + RF (cavities, klystrons, .....) + vacuum components + accelerator expertise + BABAR as the foundation of an upgraded detector David Hitlin P5 Meeting - SLAC February 21, 2008

  21. How much will SuperB cost? From the SuperB CDR* Value of reusable itemsfrom PEP-II and BABAR Disassembly, crating, refurbishment andshipping costs areincluded in project costs *In the SuperB CDR costs were presented “ILC-style”, with labor in man-months, M&S in €. This table translates costs into US accounting and converts to $. David Hitlin P5 Meeting - SLAC February 21, 2008

  22. The level of US participation in SuperB • The US program has a unique opportunity, in a time of scarceresources, to make a highly leveraged investment in an important new project and thus to take a very significant role • There are both accelerator and detector/physics aspects • Accelerator • SLAC’s expertise in high current, high luminosity colliders is crucial • Detector/Physics: • 30 Pi’s from 18 US and 4 Canadian institutions have expressedinterest in SuperB in a letter to the SLAC PPA Division • We expect this interest to grow • In the TDR phase: 50-75 people, including postdocs/students • In the construction and physics phase: ~150 people • The SuperB meeting in Elba (May 31-June 3) will initiate collaboration-forming activities David Hitlin P5 Meeting - SLAC February 21, 2008

  23. What does US SuperB involvement entail? • The SuperB design uses many PEP-II components • Recognizing that there is internal competition for some of these items, a DOE HEP contribution of PEP-II magnets, RF and vacuum components, as well as of BABAR, as the basis for a detector upgrade, to SuperB would give the US a central position in a new high quality, high visibility project, for very little additional capital investment • SLAC would then be the natural center for US SuperB activities, in a role that only a national lab can play • Accelerator design and some component construction • Detector design and system construction • Physics: computing and analysis • There are different possible levels of participation David Hitlin P5 Meeting - SLAC February 21, 2008

  24. US participation levels David Hitlin P5 Meeting - SLAC February 21, 2008

  25. Why isn’t the SuperB crew interested in SuperKEKB? • This question is often asked; let’s address it directly • It is universally accepted that an e+e- data sample of 75ab-1 or more is required to confront the issue of New Physics effects in B, D and t decay • SuperB produces, at 1036, 15ab-1/Snowmass year, starting in ~2015 • SuperKEKB produces, at 2 (or 1) x1035, 1ab-1/running year, starting in ~2014, with an upgrade path that reaches 8 (or 4?) x1035 in 2027 • SuperB, with a polarized electron beam, produces polarized t leptons, opening an entirely new realm of exploration in lepton flavor physics • The SuperB low emittance, low current, design presents tractable detector and background problems, and affordable operating costs • These factors have convinced us that SuperB presents the most viablee+e-option to confront the question of flavor physics in the LHC era David Hitlin P5 Meeting - SLAC February 21, 2008

  26. But it’s a green field site • Building SuperB at an existing laboratory would certainly be easier • SLAC: upgrade PEP-II • FNAL: in the Tevatron tunnel, morphing into the ILC damping rings • KEK: see previous slide • CERN: ISR tunnel circumference is too small • DESY: PETRA tunnel • Building SuperB at Tor Vergata, as an international enterprise, is feasible and even exciting • Proximity to Frascati - INFN is in the process of establishing aSuperB Project Office at Frascati • Participation of accelerator experts from other labs is crucial to success • The Lazio regional government appears interested in funding the tunnel • The innovative collider design uses many PEP-II components • Tunneling for the SPARX FEL on the site will begin within months David Hitlin P5 Meeting - SLAC February 21, 2008

  27. Conclusions • SuperB presents an exciting opportunity for the US program • A broad and deep physics program: results will be crucial to understanding new physics uncovered at the LHC • Leverage: in a time of shortage of investment capital, gives the US a major role in a European project for a relatively small investment • Timing: • SuperB provides an opportunity to retain the impressive capability of the US accelerator community by having them contribute to an innovative new e+e- collider • SuperB provides an opportunity for the very productive BABAR-CLEO-BES community to participate in a state-of-the art detector upgrade that will be producing physics in the middle of the next decade David Hitlin P5 Meeting - SLAC February 21, 2008

  28. Backup slides David Hitlin P5 Meeting - SLAC February 21, 2008

  29. Schedule Four year construction, preceded by 2-3 yearsof design and prototyping, which overlaps organizational and funding activities David Hitlin P5 Meeting - SLAC February 21, 2008

  30. David Hitlin P5 Meeting - SLAC February 21, 2008

  31. David Hitlin P5 Meeting - SLAC February 21, 2008

  32. Crab crossing experience at KEKB • Lower bunch current product makes luminosity twice of the crossing-angle collision. • However, slope of the specific luminosity is NOT understood well. • If the reason is an electron cloud, no problem after upgrade. • If luminosity is limited by something else, we must investigate it. • Synchro-beta resonance ? • Other nonlinear effects ? Onishi at Atami Workshop 1.7x1035 ex=24 nm Crab crossing 49 sp nb=50 what is a slope ? Crab crossing 3.06 sp nb=1548 22 mrad crossing 3.5 sp nb=1388 9.4/4.1 A nb=5018 David Hitlin P5 Meeting - SLAC February 21, 2008

  33. A Super B Factory is a DNA chip for New Physics David Hitlin P5 Meeting - SLAC February 21, 2008

  34. Project X flavor physics • to e conversion • Rme< 2x10-17 • in a generation12 transition • MECO/Mu2e are large,expensive experiments • Sensitivity with respect to meg? • Is this more or lessinteresting than 23 ? David Hitlin P5 Meeting - SLAC February 21, 2008

  35. Signers of SuperB letter to PPA – 10/07 David Hitlin P5 Meeting - SLAC February 21, 2008

  36. Fermilab Steering Group report – Appendix E David Hitlin P5 Meeting - SLAC February 21, 2008

More Related