Updates on Muara PortBrunei Darussalam BY MARSALINAWATI HJ OMARALI MARKETING OFFICER marsalinawati.omarali@ports.gov.bn
Muara Port Layout Note:- Restricted Areas Multi Purpose Hall Muara Export Zone BLOCK 7 INLAND CONTAINER DEPOT (ICD) Car Park To B.S.B BLOCK 6 BLOCK 5 To Bandar Seri Begawan (B.S.B) PORTS DEPT HQ Trailer Parking Brunei Shell Marketing Bitumen Trailer Parking BLOCK 1 Brusima Cement Silo OPEN AREA CAR PARK C F S TRAILER PARKING / CONTAINER YARD Muslim Graveyard BLOCK 2 Parking Lots CONTAINER YARD Water Tank Gate House Container Freight Station (CFS) BLOCK 3 Operation Office CONTAINER YARD MUARA TOWN Container Yard Gate House Reefer Station Reefer Station BLOCK 4 Workshop CONTAINER YARD Ports Department Warehouses OPEN AREA CARGO STORAGE AREA Cruise Ship Centre & Transit No. 1 Transit No.3 Transit No.2 A & B CONVENTIONAL TERMINAL CONTAINER TERMINAL 611m 250m
Project: Infrastructure / Services Logistics hub • Upgrade warehouse into bonded warehouse (ongoing)
Hinterland Connectivity • Logistics Development Project • Benefits: • Decrease total logistics cost • Alleviate traffic congestion along the road, • Reduce pollution • The important task under current development project • : road and waterway • ICD • Proposed Lumba-Lumba project
ICD Project • Muara ( 100% Completed) • Sg Tujuh (Under construction) • Kuala Lurah ( Completion by January 2010)
Project: Infrastructure / Services • New International MCT Operator • Contract awarded to ICTSI to operate and maintain MCT • Operating since 21 May 2009 • Increased productivity and efficiency
Project: Infrastructure / Services • e-PORT • Computerised system to manage port operations. • Signed on 21 May 2008. • Trial run in December 2009 • Go-Live by first quarter, 2010
Project: Infrastructure / Services • Bunkering • Signed 12 Dec 2008 • Value-added service for incoming vessels
Project: Infrastructure / Services Passenger Ferry – Operation since 17 Oct 08 • Provide connectivity between Brunei and Malaysia. • Facilities: • Ticketing Booths • Lounge • Shops • Tourist Information Counter
Project: Infrastructure / Services • Car Ferry– Operation end of 2009 • Connectivity to Labuan and Menumbok, Malaysia. • Status: • Completed construction in 2008. • 2 Coordination Meetings has been held • To hold another Coordination Meeting in January 2010.
Project: Infrastructure / Services • Passenger & Jetty for Bangar, Temburong • Foundation Laying – 18 April 2009 • Status: Completion by Jan 2010 • Objective: To provide better facilities for domestic passengers and cargo transportation.
Project: Infrastructure / Services • Cruise ship center (Currently serve between 2-4 cruise ship a month before end of 2009)
Cruise Liners • 2008 • FUNCHAL • COSTA ALLEGRA • SILVER WHISPER • PACIFIC SUN • C. COLUMBUS • CRYSTAL SERENITY • AMSTERDAM • 2009 • COSTA CLASSICA • DAWN PRINCESS • AIDAcara • MV SEABORNE ODYSSEY • SEVEN SEAS VOYAGER • M/S ASTOR • COSTA ALLEGRA • DELPHIN VOYAGER • C COLUMBUS • ARION • SUN PRINCESS • COSTA ROMANTICA
Projected Growth • Cruise Vessels in 2010 = 26 vessels
Project: Activities New Website • Information Dissemination • Daily Updated Shipping & Ferry Schedule • Latest Cruise Schedule • Tender Information
Project: Activities • SAFETY CAMPAIGN (Launched 12 Dec 08) • ISPS Code (Continuous auditing)
Future Development Pulau Muara Besar Source: BEDB
Pulau Muara Besar Development • Project Information: Led by Board of Economic Development Brunei (BEDB) • Status: Consultants works completion by October 2009
Phase 2 & Beyond Bridge Pulau Muara Besar Development Existing Channel Phase 1 Reclaimed Land 3km Source: BEDB 6km
Halal Food Distribution Hub Logistics companies Warehousing Developing PMB Source: BEDB PHASE 2 & BEYOND PHASE 1 Export Processing Zone Petrochemical, Oil Refinery and other downstream export industries PUALA MUARA BESAR • Quay length- 700 m straight line • Water depth- min 6m draft • Capacity- 800,000 TEUs 6km