1 / 5

Board Update

Board Update. K-1 student numbers 20 May 2013. K-1 Enrollment - 2013-14 ( After student movement). Student Movement from LV – 2013-14. Moving from LV to HW 1 – 1 st graders 4 – 3 rd graders 4 – 4 th graders Moving from LV to HL 3 – 1 st graders 2 - 2nd graders 4 – 3 rd graders

chavez
Download Presentation

Board Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Board Update K-1 student numbers 20 May 2013

  2. K-1 Enrollment - 2013-14(After student movement)

  3. Student Movement from LV – 2013-14 • Moving from LV to HW • 1– 1stgraders • 4 – 3rd graders • 4 – 4th graders • Moving from LV to HL • 3 – 1st graders • 2 - 2nd graders • 4 – 3rd graders • 1 – 4th grader • 1 – 5th grader • Moving from LV to SB • 3 – 1st graders • 2 – 2nd graders

  4. Lakeview Students Numbers (2013-14) • Open Enrollment Numbers • Kindergarten - 0 • Grade 1 - 0 • Grade 2 - 3 • Grade 3 - 6 • Grade 4 - 1 • Voluntary Movement out of Lakeview • 2 students • 1 - K • 1 - 1st grade

  5. Cost • Curriculum Cost • $5000.00 for each section added • Move Computer lab to Media Center • 35 computer cable runs $4,500.00 • New electrical wiring $4,000.00 • New network switch $1,000.00 • Total estimate $9,500.00* *This does not include labor time/cost of the physical move or reconfiguration of network/switches.

More Related