Agenda Item 5 SPECIFICS ON FM BROADCAST INTERFERENCE AND LATEST WORK presentation by

International Civil Aviation Organization Regional Preparatory Group (RPG) Meeting for World Radiocommunication Conference 2007 (WRC-2007), ACP Working Group B and F and NSP SSG Meetings. Bangkok, Thailand, 21-25 February 2005. RPG/ACP/NSP pres4. Agenda Item 5

chavi
Download Presentation

Agenda Item 5 SPECIFICS ON FM BROADCAST INTERFERENCE AND LATEST WORK presentation by

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. International Civil Aviation OrganizationRegional Preparatory Group (RPG) Meeting for World Radiocommunication Conference 2007 (WRC-2007), ACP Working Group B and F and NSP SSG Meetings. Bangkok, Thailand, 21-25 February 2005.RPG/ACP/NSP pres4 Agenda Item 5 SPECIFICS ON FM BROADCAST INTERFERENCE AND LATEST WORK presentation by Steve Mitchell

  2. A LITTLE BIT OF HISTORY • Changes to ITU Radio Regulations • recognition of potential interference to aeronautical systems • studies within the ITU • initial studies • further enhanced studies • final ITU recommendations

  3. GENERAL TYPES OF INTERFERENCE • Four types of interference to consider • Type A • A1 • A2 • Type B • B1 • 2 signal • 3signal • B2

  4. DIFFICULTIES WITH ILS/VOR/COM • Extensive testing • ILS/VOR receivers • 3rd order intermodulation • saturation • Com receivers • ICAO Annex 10 SARPs requirements • 3rd order 2 signal • Desensitisation

  5. DIFFICULTIES WITH GBASAND VDL 4 • Testing of GBAS and VDL 4 receivers • same mechanisms apply as for ILS/VOR/COM • avionics manufacturers tests above 112 MHz • split in desensitisation requirements • similar A1and B1 criteria as ILS/VOR • ICAO Annex 10 SARPs requirements • 3rd order 2 signal • Desensitisation

  6. Co-ordination • Why co-ordination? • Between FM broadcasters • mutual sharing • Between FM broadcasters and aeronautical • avoid interference to aeronautical services • Between aeronautical and FM broadcasters • avoid potential problems

  7. Example of co-ordination process • Example of an approach to co-ordination • European example • inside a State • databases • computer tools • agreement mechanism • between States • LEGBAC/EBU

  8. TYPE A1 CALCULATION

  9. TYPE A2 CALCULATION

  10. TYPE B1 CALCULATION2 SIGNAL

  11. TYPE B1 CALCULATION3 SIGNAL

  12. TYPE B2 CALCULATION

  13. TRIGGER AND CUT-OFF CALCULATIONS

  14. ILS PROTECTION

  15. VOR PROTECTION

  16. CURRENT STATUS OF WORK • ITU • Working Party 8B • Development of new recommendation • Information on interference to FM receivers • ICAO • NSP SSG • ICAO input to ITU

  17. FURTHER WORK WITHIN ICAO • ILS • GBAS • No compatibility shown • VDL 4 • No compatibility shown