1 / 13

EFGH Meeting Presentation

EFGH Meeting Presentation. What’s Dana-Farber Research Computing been up to this year. -- Matt Temple. Rejected Data Center Plan. RC Infrastructure. Cost Estimates. 6/8/2010 -- From DFCI Facilities... > > Matt, there were two versions of capital budget estimates generated by me with

cheche
Download Presentation

EFGH Meeting Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EFGH Meeting Presentation What’s Dana-Farber Research Computing been up to this year. -- Matt Temple

  2. Rejected Data Center Plan

  3. RC Infrastructure

  4. Cost Estimates • 6/8/2010 -- From DFCI Facilities... • > > Matt, there were two versions of capital budget estimates generated by me with • > > help from Bill Leuci/Xnth. • > > Budget estimate 11-004 considered expansion of the existing Data Center to a • > > larder footprint within adjacent area. It was not based on any specific set of • > > drawings but did assume physical expansion of space and mechanical equipment to • > > support 18 racks. Our project cost excluding any Data Center equipment for this • > > scope was $1,958,000. • > > Budget estimate 11-004A considered expansion within the existing footprint to • > > accommodate current growth by consolidating some racks and possibly adding high • > > density rack options. No major upgrades to mechanical systems other than a new • > > UPS and necessary wiring. The UPS would occupy space in the adjacent testing • > > lab. Our project cost excluding any Data Center equipment for this scope was • > > $302,000. • > > We did have one version from the architect showing expansion but when discussed • > > in detail with Bill and group we decided it was not adequate, mostly for • > > mechanical support reasons. I have attached it here for reference, but not to be • > > used for final planning. • > > • > > I am now setting up a PO and agreement with Xnth for the study of current • > > conditions as the funding has been released to cover the PO. I will let you and • > > Lisa know when they are onboard and ready to gather information.

  5. Engineering Report Produced

  6. Infrastructure Map

  7. CCGD Infrastructure

  8. HPC Infrastructure

  9. VMWare Infrastructure

  10. Proxy Infrastructure

More Related