An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scaling Up the Nutrition Response in The Philippines Key Challenges &Lessons Learnt

  2. Needs Assessment and Analysis

  3. Needs Assessment and Analysis (1/2) • Primary Needs analysis showed high GAM-SRP Targets • Government-led needs analysis had limited nutrition focus • Limited capacity of AWG to adapt existing methods for L3 level disaster-Coordination Team taking over AWG (during initial months) • MIRA-1 (limited nutrition focus) & MIRA-2 was not linked to planning (timing and methodology) • SMART survey (3 months post Haiyan) showed GAM prevalence 2x lower than expected-SRP Targets overestimated?- Revised Targets

  4. Needs Assessment and Analysis (2/2) • Limited Technical capacity in nutrition surveys and analysis (Trained FNRI team busy with NNS) • Coordinated assessments were OCHA driven • High number of meetings and clearance protocols- bottleneck to cluster needs analysis • Time difference, tight deadlines affected HQ remote support on needs analysis • Disconnect between sub-national and national discussions • Limited use of response monitoring data to complement needs assessment

  5. Strategic Response Planning

  6. Strategic Response Planning (1/2) • SRP and prioritization centrally-prepared; minimal regional consultation • Limited number of partners and low capacity in CMAM • Overstretched HR capacity of government (ongoing 3 emergencies) • OCHA-driven process with tight deadlines and no flexibility, in-depth assessment and strategic discussion • Project Proposal development – less consultative (UNICEF/WFP and Partner centric)- limited government involvement

  7. Strategic Response Planning (2/2) • Scale up delayed heavily due to paperwork/approvals (PCA/FLA) • Lack of clear arrangements for shifting government capacities to affected areas from other regions-limited number of government staff for response

  8. Resource mobilisation

  9. Resources… Finance Supply People

  10. Resource Mobilisation: FUNDING

  11. Funding challenges • 7 of 8 partners were funded through UNICEF and WFP, which delayed nutrition cluster capacity to scale up due to administrative procedures of delayed fund release • Government Funding was not tapped for nutrition Haiyan SRP planning and implementation ($10 M SRP funding covered through UNICEF, WFP and ACF)

  12. Resource Mobilisation: SUPPLY Photo Courtesy: WFP Philippines

  13. Supplies challenges • Prepositioned supplies stocks stretched - 3 ongoing emergencies • Partners brought CMAM supplies, limited consultation -led to duplication and excess • Limited CMAM capacity- limited ability to distribute excess supplies • Supplies for MNPs and RUSF only planned for 6 months in SRP- negatively impacted service delivery of MAM and MNP programmes after May 2014

  14. Resource Mobilisation: HUMAN RESOURCE CAPACITY

  15. Human Resources-Challenges • Limited DOH technical staff/capacity to respond- high staff retirement • Local government personnel were morally destabilized due to losing relatives and infrastructure damage • Still a need to develop and cost a capacity development plan as part of preparedness efforts

  16. Implementation and Monitoring

  17. Cluster SRP achievements As of end August 2014 137%

  18. Implementation and Monitoring-Challenges (1/2) • Delayed programme implementation due to administrative delays (PCA/FLA) • Gap in supplies for MAM/MNPs due to pull out of WFP • IYCF counseling challenging due to limited partner and government capacity • WGs focused on technical discussions rather than operational support at beginning • No approved national CMAM guidelines, lack of CMAM capacity

  19. Implementation and Monitoring-Challenges (2/2) • Some SRP indicators (IFA and Vit A) linked to routine reporting system- incomplete/under reporting • IYCF counseling indicator not reported by govt (only NGOs) • Community nutrition volunteers are overworked