RDBE Spurious Tones. Matt Luce/Jim Jackson October 2011. Overview. The Problem Initial Measurements Mitigation Attempts Future Work. The Problem: RDBE Internals. The Problem: First Indicators. The Problem: First Indicators. Looking Closer w/PFBG 1.4. Looking Closer w/PFBG 1.4 (PCAL).

chen
Download Presentation

RDBE Spurious Tones

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RDBE Spurious Tones Matt Luce/Jim Jackson October 2011

  2. Overview • The Problem • Initial Measurements • Mitigation Attempts • Future Work

  3. The Problem: RDBE Internals

  4. The Problem: First Indicators

  5. The Problem: First Indicators

  6. Looking Closer w/PFBG 1.4

  7. Looking Closer w/PFBG 1.4 (PCAL)

  8. Looking Closer w/DDC 832 MHz 896 MHz

  9. Looking Closer w/bpplotter

  10. Looking Closer w/bpplotter

  11. Looking Closer: Terminated ADC inputs

  12. Mitigation I: Ground Isolation

  13. Mitigation II: DC block on 1024MHz

  14. Future Work • RFI Shielding of iADC • Custom • Foil • KATADC • Requires a new adc_interface • Potentially removes ALC box.