1 / 16

RSP Ten Day Out

RSP Ten Day Out. Faith Vogler. CONTACTS. MSG Dyer -NCOIC SGT Vogler RSP NCO Mr . Forbus CTC Sunny Slope Armory Northern Team SFC Chacon (TL) SFC Wright (TL)( Flagstaff ) SSG Acosta SGT Phillips ( Flagstaff ) SSG Henry SGT Fischer Union Hills Store Front

cheng
Download Presentation

RSP Ten Day Out

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RSP Ten Day Out Faith Vogler

  2. CONTACTS MSG Dyer-NCOIC SGT Vogler RSP NCO Mr. ForbusCTC Sunny Slope ArmoryNorthern Team SFC Chacon (TL) SFC Wright (TL)( Flagstaff ) SSG Acosta SGT Phillips ( Flagstaff ) SSG Henry SGT Fischer Union Hills Store Front SFC Luna (TL) SSG Everly SSG Anderson

  3. January Drill NumbersAs of 23 JAN 2013

  4. PERSTAT / Split-Trains • Bordon coded (A) Pending Discharge • 5(E) Code Split Prior to drill Pay Submitted

  5. Pay Issues None Tracking

  6. Negative End Strength Warrior: Ship Date : Issue :_________________________ Benson, Jennifer NA SM failed tape Did not ship RBJ 6FEB13 reinspect(32 days) SM showing on NES James, Xavier NA Pending Suitability Waiver? DUI SM showing on NES Smith, AndrewNA OCS Drop SM scheduled 25-Jan-13 MEPS to get AIT

  7. Negative End Strength Warrior: Ship Date : Issue :_________________________ Fulton, Samantha NA RSP initiated discharge unsat performance and conduct Sent to company 20121127 Harris, Connor NA SM Drilled ID NG 5/6 Jan 13 LOD approved #AZ-13-00015 SM showing on NES Bordon, Patrick NA ETNAC / Processing for Fraudulent Discharge All documents submitted for discharge to company 20130116

  8. Issues Warrior: Ship Date : Issue:___________________________ Johnston, Robert 5-Jun-13 SM changed High School and re- 133 Days enrolled in an online H.S. Need school letter with new projected Graduation date Mitchell, Hope 13-Aug-13 SM failed HT / WT 32% BF SM 202 Days

  9. Issues Cont. Warrior: Ship Date : Issue:_______________________ Reinhold, Sasha 3-June-13 SM requesting early ship date 131 Days Need HS letter stating new projected Grad date before we move ship date Per MSG Dyer

  10. Drill Remarks • Class room 130 ( The Large class) will be occupied by the Reserves Friday and Saturday • Classroom 116 (The one with its door opposite of the latrine) will be occupied by the Reserves Sunday 0700-1600hr

  11. Drill Remarks • EST-2000 will be available for Saturday only • Sunday Main TNG Event Blue & Green Phase combatives - SFC Sator • Sunday Main Event 2 Paint ball Red & White Phase SFC Wright

  12. Shipped Warriors

  13. Non-Shippers

  14. Admin Remarks • Currently Tracking 4 SM not loaded in TAPDB-G. • All are January enlistments. • G-1 is currently sitting on loading 40 warriors for RRB. • All Enlistments after 01-Jan-2013 need 2013 version of the W-4 in shipper packet, iPERMS, and RZ . • Pending 7 warriors.

  15. Additional Information • www.us.army.mil • http://rsp.nationalguard.com • www.goarmy.com

  16. GO ARMY! Watch Me!

More Related