1 / 3

4 Capabilities of Lean Leaders

4 Capabilities of Lean Leaders. C1 PROCESS DESIGNER The ability to see all work as a well defined process with pre-specified work and embedded tests to show status C2 PROBLEM SOLVER

chenoa
Download Presentation

4 Capabilities of Lean Leaders

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4 Capabilities of Lean Leaders C1 PROCESS DESIGNER The ability to see all work as a well defined process with pre-specified work and embedded tests to show status C2 PROBLEM SOLVER Those who use problems to trigger rapid, frequent small improvements to bring a process back to expected outcome C3 SHARER One who finds systemic means to talk about improvement successes and failures to encourage continuous improvement C4 TEACHER/MENTOR The ability to direct problem solving in a manner that builds C1, C2 & C3 abilities in other associates

  2. Design Process Using SPCA • System: Measurement. HOW MUCH is expected? • How do we know if our process is working? • Are we ahead or behind of what is expected? • Pathway: WHO is responsible for performing this task? • “When it’s everyone’s job, it’s no one’s job”. • Connection: How do we know WHEN to perform task? • What is the “trigger”? • Activity: HOW is the task completed? • Content • Sequence • Timing • Outcome

  3. Sample Projects • Turn around time for Neg. Mamo • 5days reduced to 24 hrs • Stroke protocol compliance • <30% improved to >95% long term • Stocking Birthing rooms • Weekly task now part of room changeover • Room stock reduced to < $130 • Room service tray line • Improved PT survey results on food quality • HIM Scanning process • >48 hrs to <8 hours

More Related