PH-DT-DI 2013/2014 CMS activities

PH-DT-DI 2013/2014 CMS activities . 2013 M aintenance ID flushing system : Maintenance 2 dryers Installation 2 flow meters Maintenance of several hygrometers (flushing system, N2 supply from membrane system, …). 2013 Consolidation ID flushing system: 3 new gas distribution racks

chesna
Download Presentation

PH-DT-DI 2013/2014 CMS activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PH-DT-DI 2013/2014 CMS activities • 2013 Maintenance ID flushing system: • Maintenance 2 dryers • Installation 2 flow meters • Maintenance of several hygrometers (flushing system, N2 supply from membrane system, …) • 2013 ConsolidationID flushing system: • 3 new gas distribution racks • Analysisrack • SX5 pixel lab dry air flushing and cooling distribution systems ID flushing system • Maintenance 2014 ID flushing system: • Replace filters in distribution racks • Calibration MFMs • Calibration safety valves A. D'Auria CERN/PH-DT-DI

  2. PH-DT-DI 2013/2014 CMS activities • Muon Detector gas systems (CSC, DT, RPC) • Maintenance 2013 • Maintenance gas systems and analysis racks • Leak campaign test on RPC • Installation heating tape on RPC new pipe. • Consolidation/Upgrades 2013 • RPC Pump upgrade in USC55 • DT high flow setup. • Commissioning RPC RE+4. Gas systems for Muon detectors A. D'Auria CERN/PH-DT-DI

  3. PH-DT-DI 2013/2014 CMS activities • 2013/2014 Gas systems/Analysis maintenance list: • circulation pumps • safety valves and bubblers • power supplies • profibusquality • pressure regulators • analysis devices • change absorber in purifier • check/repair pneumatic valves • check/repair electro valves • check/repair heating cables/connectors • check/repair pressure regulators • flow cells checking • calibrations MFC Standard maintenance list A. D'Auria CERN/PH-DT-DI

  4. PH-DT-DI 2013/2014 CMS activities • 2013/2014 Gas Detectors/Analysis extraordinary maintenance: • Software upgrade • RPC modifications to open output for Xmas 2014 • Commissioning RPC RE-4. • Repair recovery purifier column. • CSC recovery CF4 - analysis rack • CF4 maintenance/modifications/tests LS1 extraordinary maintenance list A. D'Auria CERN/PH-DT-DI

  5. Conclusions • A lot of activities completed/on-going during 2014 • Many new consolidation projects for all experiments Conclusions A. D'Auria CERN/PH-DT-DI