IGA with ADOT Design Review & Construction of the Central Avenue Multi-Use Path

City Council August 5, 2013. IGA with ADOT Design Review & Construction of the Central Avenue Multi-Use Path. Background. Construction: Received $ 1,392,047.00 Federal Funds (2014) City’s cost is 5.7 % $ 65,125.00 City’s design cost at 100% $ 249,517.00 Construction in Fall 2014

chet
Download Presentation

IGA with ADOT Design Review & Construction of the Central Avenue Multi-Use Path

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. City Council August 5, 2013 IGA with ADOT Design Review & Construction of the Central Avenue Multi-Use Path

  2. Background Construction: • Received $ 1,392,047.00 Federal Funds (2014) • City’s cost is 5.7% $ 65,125.00 • City’s design cost at 100% $249,517.00 • Construction in Fall 2014 Design • City has contracts with Wood Patel, Stanley, Harrington Planning & Design and EEC (forthcoming).

  3. Terms of IGA (State) • Be the designated agent • Review the design plans, specifications, and provide services for construction bidding and construction administration • Submit all documentation to FHWA

  4. Terms of IGA (City) • Prepare the design plans, specifications, and incorporate ADOT comments. • Provide post-design services. • Certify all necessary ROW acquired • Pay any City requested changes to Project, and cost above federal funding level • Maintain and assume full responsibility of the Project upon completion.

  5. CostShare Design • State design review fee*SZ43 01D* $ 10,000.00 Construction • Federal-aid funds @ 94.30% $ 1,077,405.00  City’s contribution @ 5.7% $ 65,125.00 City’s contribution @100% $249,517.00 • Total Estimated City Funds $ 324,642.00      • Total Federal Funds $ 1,077,405.00 • TOTAL Project Construction Costs** $ 1,392,047.00 • ** (Includes 15% CE and 5% Project contingencies)

  6. Project Location

  7. CentralAveExistingSection

  8. ProposedImprovements • New pavement section • Separated bike path • Enhanced landscape • Improved & decorative streetlights • Bus stop shelters • Busbays • Limited on-street parking

  9. CentralAveMulti-UseImprovements

  10. Benefits • Provides path for bike riders • Increases safety • Visual enhancements • Links commercial, school and residential • Sets tone for future projects

  11. CommunityFeedback • Support from schools, churches and businesses • Residents like the overall concept • Presented to EERNC

  12. Conclusion Staff recommends approval of IGA with ADOT for the Design Review and Construction of Central Avenue Multi-Use Path