THEAll Wall System™ “Building Better for the People of the World” Benefits: Concrete strength resists high winds, Most Energy Efficient method of wall construction (per D.O.E. tests), Zero wood and drywall boards – making this the most mold resistant method of construction that is also, non-combustible and non-flammable, as well as 100% termite indestructible.
END OF FIRST DAY OF TRAINING 10:30 AM TO 4:30 PM END OF DAY ‘5’ (TO START POINT)
INTERIOR STRUCTURAL BEAMS AND COLUMNS AND GARAGE HEADER BEAMS
PORCH BEAMS AND COLUMNS PLUMBING PREPARATION LEDGERS INSTALLED AND FLOOR TRUSSES CAN BE SET, BEFORE THE WALLS ARE FILLED
4 MEN - 6 DAYS FOR THIS FIRST FLOOR, PORCHES, INTERIOR BEARING WALLS, INTERIOR STAND ALONE BEAMS AND COLUMNS TOP CHORD BEARING TRUSSES TWO DAYS LATER: IN ONE MORE DAY THE SECOND FLOOR IS 100% INSTALLED