An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. (Title) – Operational Readiness Review (ORR) Edits are made on the slide master accessed via: /View/Master/Slide For Minor Projects, LLE combines the FDR & ORR EQC Checklists: /View/Master/Slide Update logo Date of Review First Use Acknowledgements Image of diagnostic Establish Key Contacts (name) PI (name) PA LLE Will Complete after the review Update Date from /View/Master/Slide Master Enter number of pages – required for PDM submittal 5/17/10

  2. Overview - Motivation -Summarize Scope-Summarize Motivation Campaign Details:EP or Omega Or Joint Shot?;Campaign Type? Side Lighter/ Back Lighter?What TIM’s or Fixed? High Xrays, High Yield? High EMP?, Tritium? 5/17/10

  3. Design Overview A few overheads showing design – diagnostic and overall deployment 5/17/10

  4. Beam Envelope - Clearances Step File must be sent to LLE one week prior to the review for beam clearance and space envelope checks 5/17/10

  5. Space Claim – Floor Plan - Storage 5/17/10

  6. Operations • Setup/Alignment Overview • Typical Shot – Steps to Service diagnostic • SRF Status • Status of Procedure – Approved Procedure: install, Alignment and shot operations procedure must be in the PDM and approved by LLE prior to ORR • Preventative Maintenance Procedures – Status • Spare Parts 5/17/10

  7. FDR Action Items Copy FDR Action Items Table Here; Review after the design presentation; this helps LLE to understand the items are addressed 5/17/10

  8. Safety Inspection Action Items 5/17/10

  9. Viewing/Editing SRA – 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3)Edit then Select Save & Print 4)This button allows the SRA to be viewed/printed/saved – Save the SRA 5)Take a screen shot of the SRA and place in presentation 2) Select SRA 5/17/10

  10. SRA 5/17/10

  11. FMEA – Each Entry on SRA requires an Entry on FMEA; additional entries can be made Enter the Line #’s into the SRA Form (Associated Risk) There must be a change in one of these two columns (Before vs After) Double Click & Edit 5/17/10

  12. Viewing EQC 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3) Select “Save & Print Landscape”; Take a screen shot of each page and put in presentation (two slides) 2) Select EQC 5/17/10

  13. EQC 5/17/10

  14. EQC 5/17/10