An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Christchurch Transportation Planning Post Feb 2011 Earthquake Presented by Andrew Metherell

  2. Contents • Introduction • Land Use • Available Data • Estimating Changes • Modelling • The CTM • Application and Results

  3. Where is Christchurch?

  4. Christchurch Statistics • Population: 415,000 • Households: 150,000 • Total Area: 1,425 km2

  5. The Earthquakes

  6. ~1,200 road surface defects >50,000 road surface defects

  7. The Effects • Roads closed, CBD shut • Households, business, schools and shops re-located • Traffic increases on key routes • Increased travel time • Reduced trip reliability

  8. The Responses • “Get Christchurch Moving” – Emergency Response • “Keep Christchurch Moving” • Review of Forward Capital Works Programme • Utilise Christchurch Transportation Model (CTM)

  9. The Model • Land use based, various forecast years • Person-based travel • Strategic network representation • Wide geographic area • Daily travel calculations

  10. Policy Assumptions Land Use Data Network Data Zonal Trip Ends Generation Modal Choice Trip Distribution Route Choice (Assignment) Results Christchurch Transportation Model

  11. Modelling Plan • Immediate effects covered by emergency response • 6 month post EQ (2011) • Compare pre and post EQ travel demand changes • Confirm observed change in travel patterns • 5 years hence, 2016 various rates of recovery to CBD • Identify recovery travel demand changes • Test forward work programme effects • Long term, 2026 and 2041, assume full recovery (for now)

  12. Land Use – Available Data • Post Redirections • Residential “stickers” (red/yellow/green) • Local knowledge • Transport planners • Real estate experts

  13. Household Postal Redirections • FROM • TO • As of 12 April 2011 • 64% redirects remain with City

  14. Net Postal Redirections • 3,700 redirects from (red) • 2,400 redirects to (green) • Excludes PO boxes

  15. “Stickers”/Placards • What do the three colours mean? • RED – Do not enter a red placarded building because it is unsafe • YELLOW – Buildings suitable for restricted access until issues are resolved • GREEN – Building accessed and no structural hazards apparent

  16. Residential “Sticker” Status • Red or yellow stickers • 5,750 households “lost”

  17. Land Use – Estimating Changes • Determine overall net loss (pop/HHs) • Determine geographic distribution • Reductions • But increases in some areas • With CBD closed, where will business (& jobs) be?

  18. Net Loss – Population / HHs • Population loss • 10,000 Christchurch • Estimate household reduction from population (2.6 ppl/hh) • 3,800 less households Waimakariri Christchurch Selwyn

  19. Geographic Distribution • Household loss areas • Residential sticker status • Postal redirection • Vacant residential land • Where will people move to? • Zoned “vacant” residential land • Some in damaged areas

  20. CBD Job Loss • Main job loss in CBD • Unemployment likely to rise (so fewer jobs overall) • Pre-quake 55,900 • Post-quake 30,900 CBD Fringe -50%* Pre=8,100 Post=4,900 CBD Outer -10% Pre=25,100 Post=24,400

  21. AIRPORT CBD PORT Job changes around the city Existing Major Business Areas

  22. Roads of National Significance

  23. Modelling – Scenarios Evaluated 2016 Onwards 2011 Pre Post Initial RoNS Full RoNS Pre 2011 Post Post LAND USE 2016 Pre Pre 2026 2041 Pre 4 Stage Model Run Assignment only, fixed demands

  24. Forecast Post-Quake Changes INCREASE DECREASE • 2011 Daily Demand

  25. Future Network Implementation – Initial RoNS INCREASE DECREASE • 2016 Daily Demand Change with Initial Road of National Significance (CSM1 and Western Corridor)

  26. Initial RoNS – Congestion Relief Land use: 2016 Post-Quake Network: 2011 Post-Quake Land use: 2016 Post-Quake Network: 2011 Initial RoNS

  27. Outcomes • CTM useful in post earthquake planning • Traffic forecasts consistent with post quake counts • Able to demonstrate initial RoNs required

  28. Acknowledgements

  29. Questions?