1 / 21

MONTGOMERY COUNTY POLICE

MONTGOMERY COUNTY POLICE. TRAFFIC STOP PROGRAM. Briefing for. TRAFFIC RECORDS FORUM. Dave Linn MCPD Technology Division 240-773-5211 linnd@co.mo.md.us. August 7, 2002. TRAFFIC STOP DATA COLLECTION. Background Data Elements Dual Track: Paper - Electronic Training Electronic:

chiko
Download Presentation

MONTGOMERY COUNTY POLICE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MONTGOMERY COUNTY POLICE TRAFFIC STOP PROGRAM Briefing for TRAFFIC RECORDS FORUM Dave Linn MCPD Technology Division 240-773-5211 linnd@co.mo.md.us August 7, 2002

  2. TRAFFIC STOP DATA COLLECTION Background Data Elements Dual Track: Paper - Electronic Training Electronic: Hardware/Software Test Period Analysis & Data

  3. BACKGROUND: • Allegations • DOJ Investigation • Agreement: • DOJ • MCPD • FOP • MC Govt • Office of Internal Affairs • Data Collection • Training • Policy • Oversight • Independent Analysis March 2000 90 Days to Implement

  4. DATA ELEMENTS: Required: Date Sub-Group Type of Stop Location Time of Day Duration of Stop Driver Race Driver Gender Year of Birth County resident License State Tag State Driver Status Driver Violations Charges (non-traffic)

  5. DATA ELEMENTS: County Optional: Vehicle Search Items recovered Duty Status Passenger Status Passenger Violations Passenger Charges (non-traffic) Related CRs PIN Comments

  6. REQUIREMENTS PAPER or ELECTRONIC?: Dual Track: Develop Paper Reporting Process Electronic Data Collection

  7. COST BENEFIT ANALYSIS: Data Base/Hardware Pick List Reduced Errors No Supervisor Time No Data Entry Positive Attitude Migration to Mobile Data Forms Processing Time Supervisor Time Accuracy Data Entry Personnel Entry Errors Attitude Electronic Data Collection Pay Back Within One Year

  8. ELECTRONIC HARDWARE: BASIC REQUIREMENTS (Spring 2000) Simple Operation Not Wireless Expandable for Other Functions • Pocket PC: • 16 meg RAM • Less Costly • Expansion Slot • Compatible to MS Office • Palm: • Limited to 8 meg • Costly • Limited Expansion

  9. Compaq Aero 1550 • Small Size • Sharp B/W screen • Backlite screen • 16 meg memory • Compatible with MS Office • Reasonable Cost ($280) • 14 hour rechargeable battery • Easy to Use

  10. ELECTRONIC SOFTWARE: Contractors: End to End Solution Client (Windows CE) Communications (CE Fusion) MS Access Data Base 90 Day Development Period Concurrent with Policy & Training Software and Communications Programs

  11. TRAINING All Sworn and Non-Sworn Personnel All Personnel - 1 hour on DOJ Agreement All Sworn Personnel - 1 hour on data elements & policy All Sworn Personnel - 1 hour on Pocket PC Pocket PC was issued after training

  12. TESTING: 30 Day Operational Test 7000+ Records No serious problems Positive Officer Response Operational Sept 1, 2000 Today: 145,000 plus records August 2000

  13. DATA & ANALYSIS MCPD Web Page www.co.mo.md.us/services/police

  14. DATA & ANALYSIS 14,000 10,000 6,000 2,000 # Stops Indian Asian Black Hispanic White

  15. DATA & ANALYSIS

  16. DATA & ANALYSIS

  17. LESSONS LEARNED: • Officer Involvement in Development • Training is Critical • Officers Accepted Pocket PCs • Test Each Stage of Development • Policy Required Early • Union Involvement Important • Positive Impact of Technology • Early High Loss / Damage Rate • Accountability for HW & Data

  18. FUTURE: Migrate Traffic Stop to Computers in Vehicles:

  19. Future: Public Safety 2000 800 MHz Radio New ECC (TMC Planned) Alternate ECC New CAD Mobile Data AVL/Mapping GIS Records Management System August 2002

  20. Future: Public Safety 2000 800 MHz Radio (Tested and Ready) New ECC (Ready) (TMC Planned) (Underway) Alternate ECC (2004) New CAD (November 2002) Mobile Data (Now) AVL/Mapping (November 2002) GIS (November 2002) Records Management System (Spring 2003)

  21. Questions: • Why not wireless? • Why not use for other mobile data? • Why not grant money? • What was community reaction to collections? • What was community reaction to analysis?

More Related