1 / 44

MECHANICAL PLANNING & ELCTRONIC PACKAGING

MECHANICAL PLANNING & ELCTRONIC PACKAGING. MECHANICAL DESING DIVISION STURCTURE. LOCATION – TEL AVIV. 10 YEARS EXPERIENCE. TEAM OF 6 ENGINEERS INCLUDING MANAGER AND TEAM LEADER. AVERAGE PROJECTS PER MONTH : 20-30. U.S.R CAPBILITIES IN ELCTRONIC PACKAGING.

chun
Download Presentation

MECHANICAL PLANNING & ELCTRONIC PACKAGING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MECHANICAL PLANNING & ELCTRONIC PACKAGING

  2. MECHANICAL DESING DIVISION STURCTURE • LOCATION – TEL AVIV. • 10 YEARS EXPERIENCE. • TEAM OF 6 ENGINEERS INCLUDING MANAGER AND • TEAM LEADER. • AVERAGE PROJECTS PER MONTH : 20-30.

  3. U.S.R CAPBILITIES IN ELCTRONIC PACKAGING • PLANING FOR PUNCHING MANUFACTURE. • PLANING FOR NIBLING MANUFACTURE. • PLANING FOR EXTRUSION MANUFACTURE. • PLANING PLASTIC PRODUCTS FOR HIGH\LOW • PRESSURE\STL\MILLING MANUFACTURE. • PLANING FOR ALUMINUM CASTING MANUFACTURE. • PRESSURE CASTING, SAND CASTING.

  4. PLANING FOR PUNCHING MANUFACTURE

  5. PLANING FOR NIBLING MANUFACTURE

  6. PLANING FOR EXTRUSION MANUFACTURE

  7. PLANING PLASTIC PRODUCTS FOR HIGH\LOW PRESSURE \STL \MILLING AND INJECTION MANUFACTURE

  8. STANDARDS PLANING IS BASED UPON • RFI – RADIO FREQUENCY INTERFERENCE. • IP STANDARTS – OUTDOOR CONDITIONS. • THERMAL ANALYSIS – MODELS TEMPERTURETESTING. • ENVIRONMENTAL TESTING – OVEN/LAB TESTING. • VIBRATION TESTING – PRODUCT LAB TESTING. • HALT & HASS – PRODUCT LIFE SPAN TESTING .

  9. (RFI) Interference Frequency Radio

  10. IPSTANDARTS

  11. THERMAL ANALYSIS

  12. ENVIRONMENTAL TESTING • HUMIDITY • SUN RADIATION • RAIN • WIND • PRESSURE • SALTY ENVIRONMENT • SAND AND DUST • TEMPERTURE TESTING

  13. VIBRATION TESTING • VIBRATION WHEN THE PRODUCT IS TURNED OFF. • VIBRATION WHEN THE PRODUCT IS TURNED ON. • SHIPPING SHAKEING TEST. • ACOUSTIC NOISE. • SHOCK TESTING.

  14. HALT & HASS • APLLYING EXTREME CONDITIONS (PRESSURE, TEMPRTURE, • LOAD) IN ORDER TO FIND PROBLEMS EARLY ON. • THERE ARE SEVERAL EXPEDITIOUS EXPERIMENT: • LIFE SPAN • RELIABILITY • FILTERINGMANUFACTURE PROBLEMS PROCESSES .

  15. Design Planer Project Manager Engineering Components Manufacture Documentation Planning Process Quality Control DESING PLAN PROCESS Samples Production

  16. Certifications ISO9001:2000 certified ISO13485 (medical) certified ISO 14001 environmental

  17. IT ENGINEER SOFTWARE All factories and centers are linked and connected (data & voice ) using a common computer network. All U.S.R designer uses agile as engineering solution for all her customers.

  18. CREATING A PRODUCT MEETING THE CUSTOMER

  19. DEMANDS DEFINITION – SOW OR PRICE QUOTE • DEMANDS SPECIFICATIONS • PRODUCT AND COMPONENT DEFINIRTION • PLANING IDEAS • PRICE NEGOTIATION

  20. DESING REVIEW -PDR PDR - PREPARING BASIC FORMATION FOR CUSTOMERS. CDR - FINAL CONCEPT INCLUDING B.O.M FDR - PROTOTYPE PRODUCTION

  21. U.S.R IS USING SEVRAL SUBCONTRACTORS IN DIFFERENT FILEDS IN ORDER TO GIVE THE CUSTOMER FULL GUARANTEE. • SUBCONTRACT IN FILEDS LIKE: • THERMAL ANALYSIS • PRODUCT DESIGNER • CIRCUIT EDITOR • SHEET METAL MANUFACTURERS • PAINT AND PRINTING • ENVIRONMENTAL CONDITIONS LAB

  22. DESING REVIEW -CDR

  23. MANUFACTURE SKETCHES

  24. MANUFACTURE SKETCHES

  25. ASSEMBLY SKETCHES

  26. PREPARING CARDS LAY OUT

  27. PREPARING CARDS LAY OUT

  28. PREPARING CARDS LAY OUT

  29. CABLE PLANNING

  30. WIRE SKETCHING

  31. STEPS AFTER MECHANICAL PLANNING • BUILDING BOM OF THE MECHANICAL PARTS. • RECEIVING PRICE QUOTE METAL PARTS, WIREING AND • DIFFERNET FASTENERS – FROM SUBCONTRACTORS. • ESCORTING PRODUCT ASSEMBLY. • CORRECTIONS AFTER BUILDING PROTOTYPE. • FINAL PRODUCT.

  32. RECENT PROJECTS

More Related