Team LitWeek 11 Deliverables: Layout Drawings Justin Ballenger Brian Barker Greg Hahn Chow He Jon Klopf Vi-Vi Nguyen
Agenda • Overall Agenda: • Problem Statement • To completely redesign the fluorescent light bulb, sockets, and housing in order to create an affordable, user friendly device for changing 4 ft. fluorescent light bulbs • Week Agenda: • Engineering Analysis • Clip analysis • Layout drawings • Actual design drawings that could be used for future fabrication
Factor of safety with the bulb in place 7.57 Force required by user to push the bulb into the clips 12.48 lb Calculated factor of safety for fatigue 1.4 Fatigue strength at 1000 cycles 242,664 psi After 1,000 cycles, clips have only fatigued by 0.2% Bulb life ≈ 10,000 hrs ≈ 1 year 1,000 cycles ≈ 1000 yrs Clip Analysis