Optimizing Movement Procedures for OPB in NFL Facility

This document outlines the risks associated with moving the OPB using beat-up scooters or forklifts, stressing the need for safer alternatives. Closure criteria include introducing new tools on-site for OPB scooters. Applicability targets specific line numbers (9, 10, 8), with actions assigned to Supplier/Partner Focal N. Norman/K. Helms. Anticipated benefits include weight reduction and schedule optimization. The solution involves a systematic approach from tooling creation to implementation. The document is applicable for movement improvement within the NFL facility setting.

ciara
Download Presentation

Optimizing Movement Procedures for OPB in NFL Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CS280 OPB Movement (NFL) Responsible: Smeltzer Approved by: Wigant Date: 8/1/2012 GTG: Y R Is / Was • Description: • Moving the OPB with beat up scooters and pushing by forklift or by hand presents high risk to personal injury or property damages • Closure Criteria: • New tools on site for OPB scooters and provide an on site alternative to manual • OPB moving   Applicability: -9 -10 -8 Line no. Target : 105 (Pull-Up) Status: Reasons: Perform. Cost Maint. Produce. Rate Supplier / Partner Focal: N. Norman/K. Helms Originating Organization: ME   Anticipated Benefits: Customer:________Program__ Weight reduction:______N/A__ Labor hrs reduction:____TBD_ Cr path reduction:_____12 hr__ Schedule 5. Solution ID’d In work 4. Provide Tooling action 3. Review and Provide CN 2. Tooling Design Review 2. SOW Reviewed by Tooling 7. Tooling and Support implementation 1. SOW Created 6. Tooling Try-out BOEING PROPRIETARY ECCN 9E991

More Related