An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Responsible: B. Kearns Status Date: 8/13/12 Approved by: S. Przybelinski R R GTG: Is / Was 118 Eng & Tools 5X5 Kickoff AP 82 Incr Pullup 5X5 Sback KHI eng Pull-up Test Pullup Anal. stress visit C-clamps Schedule BOEING PROPRIETARY ECCN 9E991

  2. CS260 door surround manipulator sketch Phase 1 Design reviews in process Unloads FAJ, provides transport and 6 axis manipulation. Also need c-clamp tools with load cells. Phase 2 KHI style door surround manipulator Provides manipulation, strong back, and pullup Simple manipulator + calibrated c-clamp Boeing Proprietary

  3. BSC | Section 47 Door Frame Installation Executive Owner: K. Heitkamp Focal: B. Kearns Updated: Aug 13, 2012 777 Program Level Risk - Risk Summary Grid Report Issue Description (5): • Door surround/edge frame installations have excessive gaps at barrel interface. This results in lost flow days due to shim fabrication and/or NCR processing to fill gaps and overall installation will not meet rate requirement. Impact: • CS260 JBS and flow impact, traveled work to CS270 and CS280 • Inability to meet 4 day and 3 day rate requirements Drivers: • Poor barrel IML profile • No engineering requirement for 5x5 at door • Door surround/edge frame installation profile • Engineering allowable for pullup is limited to 10# per foot Mitigation Actions (Interim): • Initiate engineering change for increased pullup – longwave central region pull up (M. Berden, ECD 6/28) 8/9 update - stress will require 5x5 so this change moves to AP118 incorp. Matt Berden is requesting MPH for AP118 to AP126 and change at AP127. • DE to start the discussion with LE about MPH process on ~AP118, (M. Berden) ECD 8/23 • DE to confirm KHI engineering allowables for shim and pullup (M. Berden), ECD 7/16 Complete 8/9. KHI is limited to 5# per foot by engineering. KHI uses power clecos so team doe not understand the process. • Issue ELR to add 5x5 requirement at doors (ME/Jamie Bigley) ECD 6/22 • 403Z5019, complete ELR 075686, meeting 6/28 with BSC and Everett DE, AP127 incorporation on plan • MPS and sanding, improved check tools – identify AP incorp. (Indelicato)APxx • Modify bar charts/assign MTs to increase hours on rework (IE/Rehn) ECD TBD. Need to bring this to CF SAM for approval of additional work • Improve tool used to check 5x5 quality (Tooling/Don Craig), ECD 8/14 • Sec48 crown was first prototype of new tool - arrived 7/12 and buyoff 80% • Door surround check tools – design ECD 8/1, LUT ECD 8/14 • ME and tooling to meet to simplify calibrated c-clamp to improve lead time (Norman / Bigley), complete – new ECD 9/14 ready for use • IE to determine the critical path flow save (IE/Novotny/Lynch) ECD 8/23 • Engineering changes for 5x5 requirement & increased pullup (DE/Matt Berden) ECD 8/24 • Hard tooling changes to achieve 5x5 (LE/ME/BRT) Complete, AP118 Mitigation Plan – med/long term • Design action for strong back/manipulator, complete • Design action for strong back/manipulator + pullup, need more benchmarking • Verify max additional pullup allowance as required with analysis. Initial stress feedback is that 20# per foot would be acceptable with 5x5 improvements, a defined sequence, a distributed load, and 0.005 gap-closure. • Complete per Matt Berden on 7/12. Stress has analysis and 50# per 6” is approved with validated assembly process. • 7/30 update – Stress and DE will require 0.005/5” IML quality to approve any additional pullup to current 10# per foot allowance. • 7/31 update – Stress is re-evaluating 5x5 prerequisite • 8/9 update – Two separate changes Help Needed • This project moved out past 3 day requirement due to stress 5x5 requirement. Need new rate enablers to get to 3 day.