An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Steps to the Preliminary Design Review (PDR) ACES Presentation T. Gregory Guzik January 28, 2003

  2. What is the PDR? • Organized by the ACES Program • Results from your design phase • Should show that you have “thought the problem through” • Include written report and oral presentation • PDR reviews will occur on Feb. 27, 2003

  3. Logistics for the PDR • You will be reviewed by the ACES Program (i.e. Guzik, Wefel, Johnson, Ellison, Giammanco) • Written PDR Document will be due by 9:00 pm on Tuesday February 25, 2003 • Presentations by the Team Spokesperson will be scheduled for Thursday, February 27, 2003 starting at 7:00 pm • Presentation will be 15 minutes long plus 5 minutes of questions (20 minutes total).

  4. The PDR Decision • Results from the review team will be available by COB February 28, 2003 • Written comments will be made available to the team. • If approved you can immediately begin development. • If disapproved you will need to revise your PDR and resubmit for review.

  5. Why would the PDR be disapproved? • Your mission objectives are inappropriate • “We plan to fly a rock!” • You did not “think the problem through” • “We will measure the temperature of the jet stream using the rocket platform.” • You exceeded a major constraint. • “Our multi-wavelength spectrometer weighs 30 kgs, costs $30,000 and won’t be ready until Fall, 2005!”

  6. The 4 Ws + H can help with your PDR development • Why? – mission objectives, goals & justification • What? – payload design & cost including systems, electrical, mechanical, software, thermal & interfaces • Who? – project management, work breakdown, task assignments • When? – milestones, timeline, staffing • How? – mission operations, data analysis

  7. PDR Document Template • Microsoft Word document that you can edit and add to. • Includes all of the major sections you will need to address. • Includes some discussion about what should be included in each section. • On your team computer under ACES > PDR Docs

  8. Cover Page Shows Core Information

  9. When you change a document you need to track that information

  10. TBDTo Be Determined This page provides a basic list of what still needs to be done

  11. Addressing this list of topics will provide all the basic information needed to define your payload

  12. Provide a list of all the figures in your document This is a suggestion of some of the types of figures you might want to include

  13. Provide a list of all the tables in your document This is a suggestion of some of the types of tables you might want to include

  14. Section 1.n is more or less done Section 2.0 lists your references Section 3.n describes what science you want to do

  15. Section 4.n describes all the details of your payload design Section 5.0 discusses your plans for immediately after PDR

  16. In section 6.n you show how you will get your payload flight ready What you intend to do during flight operations is in section 7.n

  17. Project management, as we discussed last week, is detailed in section 8.n Microsoft Project can help you with section 9.n

  18. Your costs and acquisition plan are in section 10.n Section 11.0 describes any risks you have identified that could impact your project

  19. Look at examples • Proposals and other project documents on the bookshelves • MS Project files illustrate how to setup a Gantt chart • MS Excel file shows an example WBS structure • Ask questions.