430 likes | 720 Views
BRTS LAHORE. 28.7 km ( Shahdra to Gajjumatta ). 27 stations (54 platforms). 8 at grade intersections. Depot Chungi Ghazi Qainchi Gulab Devi Kama Chowk Azadi Timber. Elevated Portion – 8.5 km (Muslim Town to Azadi Chowk ) – 9 stations. Planning and Execution.
E N D
8 at grade intersections Depot Chungi Ghazi Qainchi Gulab Devi Kama Chowk Azadi Timber
Elevated Portion – 8.5 km (Muslim Town to AzadiChowk) – 9 stations
Planning and Execution • 9 PC-Is (Package 1 to Package 9) • Housing Department – Executing Department through TEPA (LDA) • Other Agencies involved – Urban Unit, Transport Planning Unit, NESPAK etc • Completed in Record Time – about 11 months • Total Cost – Over 30 billion PKR
Technical Proposal STOP Financial Proposal Technical Proposal Technical Financial Proposal Financial Financial Bidding Process (Single-Stage: Two-Envelope) Approval Approval Deadline Preparation Evaluation 1 Evaluation 2
Private Contractors • NLC • NESPAK • HABIB CONSTRUCTION • IKAN • SKB • ZKB • PGE • And others
ITS (Intelligent Transportation System) • SIGNAL PRIORITY SYSTEM • COMMAND AND CONTROL CENTRE • SCATS – AUSTRALIAN SYSTEM
System Overview Command & Control Center Video Walls PTZ =20 Core Network Intersections =08 Public Address System Stations =27 PTZ = 4 BOX = 6 Video Recorders, Servers, Storages Stations =27 Workstations
CCTV/ PAS/ ITS Connectivity Command & Control Center Station Station Station Intersections Station GPON-Fiber (SMF) Station Station Station Station Station Station
Communication Network(GPON) • Primary: • 48 core single mode • Secondary • 12 core single mode • Communication network • Primary communication • Gigabit Passive Optical Network (GPON) • Secondary communication • Any service provider e.g. PTCL etc. • An RJ-45 node will be provided at each Intersections/Stations
PTZ & Box Camera (Outdoor) Heavy Duty • 1-1.3Mega Pixel • IP Based • IP-66 compliant
Ethernet Switch • Remotely manageable at Command & Control Center • 10/100BaseT • 10/100/1000BaseT (combo) for uplink • Operating Temperature -10oC to +60oC
Video Wall • Projection of all PTZ & Box cameras • MBS Stations, corridor • ITS Intersections • 55”(8 x3) Matrix
Screen Management Console • Video wall management • Input / output screen management • Decode IP to VGA/DVI/HDMI • Video projection of cameras.
Installations at station • Cameras (PTZ & Box): • Installation of station cameras using foiled twisted pair cable (FTP) CAT-6 • Station Cabinets: • Installation of station cabinets for data network communication. • Installation of high environmental temperature resistant Ethernet switches for communication
Public Address System • Installation of Public Address System : • Voice amplification system at each platform. • Outdoor speakers at each platform & pedestrian bridges • Provision to playback Pre-Recorded Voice for public • Provision for custom announcement through MBS staff for general purpose as well as in case of emergency etc.
Power at (Intersection / Stations) • Power at stations through: • National power grid • Standby power generator • At each station • UPS • 15 kVA for IT & other equipments • Power at intersections • Power supply from nearby MBS station / lines • UPS at intersection for ITS
Cabinets • At Intersections • ITS cabinets will be used for the installation of Ethernet switches, camera termination etc. • At Stations • IT communication cabinets at each MBS station for Ethernet switches, camera termination, etc.
Drawings • Stations • Intersections