An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AESO Update PCC MeetingOctober 24 – 25, 2013 – Anahiem, CAAta Rehman, P. Eng. Manager, Long Term Planning

  2. Outline • Transmission Planning Update • Fort McMurray West 500 kV Project Update • AB-BC Intertie (Path 1) Restoration Progress • HVDC Projects

  3. Transmission Planning Update

  4. Alberta’s 5 Planning Regions

  5. Transmission Planning Update • Plan on filing an updated Long-term (20 year) Transmission Plan with provincial regulator in December 2013 • Plan will be available on the AESO website, www.aeso.ca • Finalizing detailed regional plans in the next two months • Detailed load flow analysis for study years 2017, 2022, 2032 • Forecasting strong load growth across the province over the planning horizon Forecast Annual Regional Load Growth

  6. South Region Development Sequence

  7. Calgary Sub-Region Development Sequence

  8. Central Region Development Sequence

  9. Northwest Region Development Sequence

  10. Athabasca & Ft Sask. Region Development Sequence

  11. FMM Bulk System Development Sequence • Development based on milestones

  12. FMM Regional System Development Sequence

  13. East Edmonton Development Sequence

  14. AB-BC Intertie (Path 1) Restoration Program

  15. Path 1 Restoration Program • Based on AESO’s recent planning study, Path 1 (AB-BC tie) can operate at full WECC path rating starting 2017 • The study focused on the Alberta system only. • A joint study is underway with BC hydro to identify possible limitations in BC system to restore the Path 1 capability • Targeted for completion by Q1, 2014. • A WECC Path Rating Process will be initiated in early 2014 • A stakeholder presentation of the study results was given on May 7th, 2013 and is available on the AESO website • http://www.aeso.ca/downloads/2013-05-07_Intertie_Restoration_Presentation_(2).pdf

  16. HVDC Projects Status

  17. HVDC Projects Status • Two 1000 MWs 500kV HVDC lines • Initially operated as 1000 MW mono-poles • Ultimately will be operated as 2000 MW bi-poles (+20 year time frame) • Both projects are in construction • West HVDC Line • Approximately 350km • 500kV Bi-Pole Structures with Neutral Conductor • ISD: April 2015 • East HVDC Line • Approximately 500km • 500kV Bi-Pole Structures with Neutral Conductor • ISD: December 2014

  18. Questions? 18