An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STATUS IN THE CLEAN ROOM Device production Until 29-06-12

  2. LHCb – Snake design 525 um thick! SS polished

  3. NA62 – Frame 2 Channels toodeep Oxide +Nitride.... 2 devicesgluedfromJerome 525 um thick! SS polished 20475 and 20477  broken!

  4. NA62 – Frame 3 – new masks Channels: 300 x 100um + 50um walls

  5. NA62 – Frame 3 525 um thick! SS polished

  6. NA62 – Pillars test FillingwithAraldite 2020 STRANGE BEHAVIOUR  New one to be made!

  7. NA62 – Dual Pyrex • New masks: • Addalignmentobjects • Position of the flats ?