80 likes | 95 Views
Create a table of contents for your design report in P4. Submit a detailed presentation with block designs, DFM, reliability and obsolescence analysis, and a prototyping demo of your project.
E N D
P4 Presentation FileDesign Report TOCPrototyping Lab • Objectives • Create a Table of Contents for your Design Report • Submit P4 Presentation with Block Detailed Designs incl • DFM • Reliability Analysis • Obsolescence Analysis • Prototyping Demo of your project No Oral Presentation Is Required (Optional)Electronic Files 1 File for TOC, 1 File for Presentation per Team
Team Deliverable: • Table of Contents for Project Report • MSWord Report Document of Table of Contents for Design Report • TOC should follow the content checklist guide (ignoring the verbal presentation elements) • Each Design Block as a new chapter • Design Block content as sub-chapters • Customize as needed checklist as needed for your project eliminating only sections that truly do NOT apply
Reuse/Update Presentation P3P4 • Team Deliverable • Reuse the following slides for P3 – In This ORDER !! • All Project Proposals including block diagrams • Team Roster and Background Slides • Recommended Project Description • High Level or User Requirements – What does it do for user? • Perf Requirements Summary • Std Requirements Summary • Basic Business Case • Refined Block Diagram - Block Diagram Description Page • Requirements Spreadsheet: Project Level Tabs (Excel File) • Requirements Spreadsheet: Block Level Tab Flowdowns (Excel File) • 1 Page on 3 Key Patents Found for Product Area – Mitigation Plan • 1 Page on Key Ethical/Societal Risk Areas – Mitigation Plan Labs 1A-B Lab 1C
Reuse/Update Presentation P3P4 • Team Deliverable – Additonal Product Level Slides • Product Safety Mitigation Slides – Lab 2 • Product EMC Mitigation Slides – Lab 2 • Product Level Design Plan Summary & Gantt Chart Slides – Lab 3 • Overall Prototype Plan, Interconnection Strategy – Lab 3 Remember to Describe ALL Requirements …. …. BEFORE Showing Any Implementation
Reuse/Update Presentation P3P4 • Individual - Block Level Slides ….. In THIS ORDER !! • Block Description and Purpose Slide – Lab 6 • Block Performance Requirements, Allocated/Associated – Lab 6 • Block Standard Requirements, Allocated/Associated – Lab 6 • Block Signal Input/Output Summary Slide(s) – Lab 1C • Block Diagram Breakdown Slide (Block Diagram of the Block) – Lab 6 • Block Production Design Schematic - Lab 6 • 3-4 Bullets on Theory of Operation • Block Production Design Bill of Materials (BOM) – Labs 6, 7, 8 • Block Detailed Design Calculations & Component Selection – Lab 6 • Complete & Document ALL Required Analysis • Complete & Document any Recommended Analysis • Block Production Design Reliability Analysis – Lab 7 (NEW) • Block Production Design Life Cycle Analysis – Lab 8 (NEW) • Block Prototype Layout (Optional depending on technology used) • Block Verification Plan (Show any results) – Lab 8 (NEW) For Each Block ---- Required Slides In This ORDER !! Show ALL Requirements BEFORE Implementation
Presentation P3P4 • Additional Product Level Slides • Product Mfg Process Design (Block Diagrams) – Lab 5 • PCB Assembly Process Diagram including all Inspection & Testing • High Level Assembly Process Diagram including all Insp & Testing • Product Overall Master BOM – Lab 5 • New – Overall Block Reliability Analysis – Lab 7 • New – Prototype Integration & Verification Photos • New – Cover Page & TOC of User Manual – Lab 8 • New – Acknowledgements (Thanks for any help) • New – Demonstration Description (What will we see?)
595 Presentation Day Remember Schedule Change! • Lab sessions will be held at normal times Mon-Wed, May 5-7th • Monday, May 5 will be a Final Lab Session for LA-803 for prototype demonstration • Tuesday, May 6 will be a Final Lab Session for LA-802 for prototype demonstration • Wednesday, May 7 will be a Final Lab Session for LA-801 for prototype demonstration • Thursday, May 8th there will be NO lecture however teams may submit a preliminary presentation file for an optional ~20 min walk through in E225. (first come, first serve) • Project Reports (Printed & Electronic MSWord files) will now be due by 9PM in E250 on Friday, May 9 • Thursday, May 1st will be a mandatory but abbreviated lecture
595 Presentation Day 3 Key Deliverables from each team! • At time of presentation, Microsoft Power Point Presentation File • Electronic Only (1 file) • Friday May 9th, by 9PM in E250, Microsoft Word Project Report • Printed Copy • Electronic Version (1 file) • Friday May 9th, by 9PM in E250, Microsoft Word User Manual • Printed Copy • Electronic Version (1 file)