1 / 53

ACADs (08-006) Covered Keywords

Reactor Regulating System. ACADs (08-006) Covered Keywords

claude
Download Presentation

ACADs (08-006) Covered Keywords

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reactor Regulating System ACADs (08-006) Covered Keywords Steam bypass, transient overshoot, reactor coolant, main turbine, nuclear instrumentation system, pressurizer, level control system, CEDMCS, Control Element Drive Motion Control System, diagram, input signal processing, turbine load index, excore control, lag network. Description Supporting Material

  2. NID20 REACTOR REGULATING SYSTEM

  3. Pre-Job Brief • Identify critical steps • Identify error likely situations • Identify the worst thing(s) that can happen • Identify specific error prevention defenses to be used • Identify actions to assure proper configuration control

  4. REACTOR REGULATING SYSTEM COURSE TERMINAL OBJECTIVE: Given the appropriate reference material, the I&C Technician will describe the operation and maintenance of the Reactor Regulating System. Mastery will be demonstrated by passing a written examination with a score of 80% or better.

  5. Lesson Enabling Objectives: EO01 Describe the method of reactor control programming used at PVNGS. EO02 State the purpose of the RRS. EO03 List the input signals for RRS and describe the source instrumentation for these signals. EO04 Given a block diagram of the RRS for reference, describe how the RRS uses signal inputs to develop CEA motion demand output signals.

  6. Lesson Enabling Objectives: EO05 Describe the RRS outputs and the effect of these on other systems when RRS is placed in the test mode. EO06 Given the appropriate procedures, describe how the testing of RRS is accomplished EO07 Describe the use of Prevent Event Tools and Electrical Safe Work Practices to minimize human performance errors. EO08 Given examples of RRS maintenance problems, determine the fault using applicable RRS prints, Tech Manual, and Setpoint Document.

  7. EO01 Describe the method of reactor control programming used at PVNGS.

  8. Temperature Control Programs

  9. Ops Info Manual

  10. TAVG is used to represent Reactor Power 100% RX Pwr 586 5.707 0% RX Pwr

  11. TLI is scaled and biased so it can be compared to Tavg 100% Secondary Load 5.707 0% Secondary Load

  12. EO02 State the purpose of the RRS.

  13. Reactor Regulating System Purpose The RRS, in conjunction with CEDMCS, forms a closed-loop control system which regulates RCS TAVG to a setpoint programmed as a function of turbine load (TLI) to satisfy 100% power Main Steam pressure requirements. The RRS provides speed and direction signals to CEDMCS to reposition regulating CEA's to maintain RCS TAVG within a deadband of programmed reference temperature (Tref).

  14. RRS Overview • The Reactor Regulating System (RRS) is a non-safety related system. • Located to the rear of control board B05 in cabinet J-SFN-C03R. • Supplements operator manual control actions by: • Furnishing rapid response Automatic Control and Control Element Drive Mechanism Control Withdrawal Prohibit (AWP) signals to the System (CEDMCS).

  15. RRS Design • The system is designed, in conjunction with SBCS, to control without significant transient overshoots, reactor power and turbine steam by-pass to counter or make adjustment for the following: • Load rejection of any magnitude. • Up to 10% step change in NSSS load. • Up to 5% per minute ramp change in NSSS load.

  16. EO03 List the input signals for RRS and describe the source instrumentation for these signals.

  17. RRS INPUTS a) Reactor Coolant System (RC) • Provides TH and TC signals from both loops to RRS used to calculate TAVG • Supplies TC for AWP. An AWP is generated from any TC loop when temperature is > 575oF. b) Main Turbine (MT) • Provides 1st stage shell pressure signals to RRS used as indication of turbine power and TLI signal to RRS c) Nuclear Instrumentation System (SE) • Provides signals to RRS from Control Channel Nuclear Instruments used in Power Error calculation.

  18. RRS INPUTS d) PLCS (SF) • The system receives from the Pressurizer Level Control System a contact closure signal indicating that the setpoint program is in Local. e) CEDMCS (SF) • The system receives from the Control Element Drive Motion Control System a contact closure signal indicating that the CEDMCS is in `Auto -Sequential' mode (AS). * Sheet 2 of 16

  19. EO04 Given a block diagram of the RRS for reference, describe how the RRS uses signal inputs to develop CEA motion demand output signals.

  20. RRS Input Signal Processing TH There is one RTD (RCN-TT-111X and 121X) located in each hot leg that is used in determination of TAVG. • The range of these RTDs is 500°F to 650°F. • A recorder and meter for both RTDs is located on B04. TC There is one RTD (RCN-TT-111Y and 121Y) located in RCS Cold Leg loops 1A and 2B that is used in determination of TAVG. • The range of these RTDs is 500°F to 650°F. • A recorder and meter for both RTDs is located on B04. • An Automatic Withdrawal Prohibit Signal (AWP) will be generated in the RRS and sent to CEDMCS if either loop TC is > 575°F.

  21. Turbine load index • TLI is used by the RRS to develop the reference temperature for TAVG based on secondary load. • Main Turbine first stage pressure (TFSP) is used to develop this signal because it is an approximate linear correlation to turbine load. • MTN-PT-PT11A and 11B provide this input to RRS. • There is not an indicator for these two pressure transmitters. • An additional first stage pressure transmitter that DOES NOT input into the RRS (PT-10) provides input to the EHC system and can be read on B06.

  22. Calculation of TREF • TLI is used to develop a reference temperature, TREF which isprogrammed from 0 to 100% TLI. • TLI output to the TREF function generator is high limited to 100%. • An AMI will occur when selected to average TLI if there is > 5% difference between TLI 1 and 2.

  23. Excore Control Channel • There are 2 control channel inputs for reactor power. • Either Rx power input or the average of the 2 may be used in RRS which is selectable on the RRS test panel. • Each Rx power input is continuously compared to the other channel and an AMI is generated at a 5% difference between channel inputs if the Rx power input is selected to average.

  24. Lag Network • The lag network gives higher amplification to rapidly changing inputs than for slow changing inputs. • This provides faster response to rapidly changing inputs than for slow changing inputs and adds stability to the temperature control loop. • Its output is sent to Total Error.

  25. Total Error • Total Error is generated by summing Power Error and Temperature Error. • When TAVE is 3oF above TREF, a CEA insertion demand is generated to insert CEA's and lower TAVE. • The insertion demand will reset at a Total Error of +2.84oF. • Likewise, at a Total Error of -3oF, a CEA withdrawal demand is generated. • This will reset at -2.84oF.

  26. TREF Vout = 3 X Ain (Tavg) – 3 X Bin (Tref) +5 Out ≤ 5.773vdc NC=+5vdc Gain = 0.188 Bias = 4.273vdc Different values in different units Gain = 3 Bias = 5.0vdc ET Vout = Vin X Gain + Bias Gain = 0 Tau = 0.1min EB’ ET’ Vout = 2.5 X (Ain) + 2.5 X (Din – 2) – 7.5 NC=+2vdc NC=+5vdc Ain (ET’) has Gain 2.5 Din (EB’) has Gain 2.5 + Bias(-)2vdc Vout has Bias (-7.5) Gain = 1.25 Bias = 2vdc Tau = 0.5 min Values represent U3 conditions

  27. EO05 Describe the RRS outputs and the effect of these on other systems when RRS is placed in the test mode.

  28. RRS outputs PLCS (SF) CEDMCS (SF) SBCS (SF) FWCS (SF)

  29. PLCS (SF) The system outputs to the Pressurizer Level Control System a 0 – 10V signal of TAVE used in the generation of programmed level from 0 to 100% power.

  30. CEDMCS (SF) The system outputs to the Control Element Drive Motion Control System as contact closures the following: • CEA Withdrawal Demand • CEA Insertion Demand • CEA High Rate Movement Demand • Tavg - Tref High Alarm (AWP - Automatic Withdrawal Prohibit) • A High Input Deviation alarm (AMI - Automatic Motion Inhibit) • A Reactor Coolant Cold Leg High Temperature alarm

  31. SBCS (SF) • Uses TAVE from RRS in generation of Quick Open Block signal and Turbine Runback Demand signal to RPCB. • Uses Reactor Power from RRS for low power (15%) AMI generation • Uses TLI for AMI permissive and AMI threshold determination • CEA Automatic Withdrawal Demand is used to reset the AMI

  32. FWCS (SF) • Receives TAVE signal from RRS used in generation of Refill Demand signal after a Rx trip. • Receives Reactor Power Signal from RRS which is used for the low power (15%) bistable - Economizer/Downcomer Swapover.

More Related