MASS. LEAN CULTURE. Summary. Mindset: Integrated Localized Suppliers Enterprise Lead Time=37 Hours Time to Change =1 Week est. Rouge 1928 . Invention of Mass Production Complexity “Any Color As long As It’s Black” . Schedule. I.

claudette
Download Presentation

Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MASS LEAN CULTURE Summary Mindset: Integrated Localized Suppliers Enterprise Lead Time=37 Hours Time to Change =1 Week est. Rouge 1928 Invention of Mass Production Complexity “Any Color As long As It’s Black” Schedule I Raw Material Supplier for all Rouge Plants To Mass Demand I Rouge Stamping Body Shop I Paint Shop I Final Area Pre-Delivery I No Market Constraint I I Rouge Power Train I I Rouge Trim and Chassis Components

  2. Summary Mindset: Mass Manufacturing Value Stream Lead Time: Power Train Off Shore= 40 Days Power Train NA=0.5-2.0 Days Frame= 6-8 Days Stamping= 6 Days Plant Lead Time=41.1 Hours Order Fulfillment=70 Days Time to Change=90-120 Days Value Added 2-3% Add 98,920sq/ft additional process area for Final Theoretical Mass Plant K.C. Surrogate To All Suppliers Schedule 13.5 Days in Dealership Delivery Pipeline To National Blend Stampings DSP/HTP 23% DSP/TCAP/HTP P-273 60% DSP/KC/NTP/HTP P-221 39.5% I 6 Days I ASRS 5 Hours 1 Hour I Body Shop Paint Shop Final Area I 6 Days 4 Hours in System 4.6 Hours in System I 150 Units Pre Delivery I 900 Units In Yard I 1100 Units in Yard 9 Hours in System Frame Milwaukee, and Belleville Ohio 100% P-273 I 3 Days I Frame Dearborn 100% P-221 Bulls-eye Suppliers Warehouse Engines And Transmissions Domestic and Off-Shore I 0.5-40 Days

  3. MASS LEAN CULTURE = Speculative Order (Dealer) Summary Mindset: Mix Volume Flexibility and Implement Steps to Lean Manufacturing Value Stream Lead Time: Power Train Off Shore=40 Days Power Train NA=0.5-2.0 Days Frame=6-8 Days Stamping=6 Days Plant Lead Time=24.8 Hours Order Fulfillment=6 hours/20 Days Time to Change=90-120 Days Value Added= 6% Heritage Current Plan Prerequisite: Customer Driven “Limited” Build Combinations Bulls-eye Suppliers Transparent Order Pipeline & Scheduling System Stampings DSP/HTP 23% DSP/TCAP/HTP P-273 60% DSP/KC/NTP/HTP P-221 39.5% 13.5 Days in Dealership Delivery Pipeline Reduce Lead Time Reduce Lead Time I 6 Days 380 Units ASRS Marketplace 5 Hours I 1 Hour Body Shop Paint Shop Final Area I 60 units in Pre-Delivery I 80 units in Dispatch Customer Order & Pick-up Center 3.1 Hours in System 9 Hours in System 4.5 Hours in System I 6 Days Frame Milwaukee, and Belleville Ohio 50% Reduce Lead Time I 600 units in yard Future Supplier Module Assembly Supplier Park FIFO Frame Dearborn 50% I Reduce Lead Time Supplier Sequence Center 4 Hours Engines And Transmissions Domestic and Off-Shore I 0.5-40 Days

  4. MASS LEAN CULTURE = Speculative Order (Dealer) Summary Flow Pull Mindset: Lean Manufacturing Value Stream Lead Time: Enterprise=19.5 Hours Plant DTD= 17 Hours Order Fulfillment= 6 Hrs Time to Change =1 Week est. Value Added 6% + ?? Heritage Future 1928 Improved Driving Test Track Spirit of Ford Strategic Delivery Initiative Integrated Supplier Campus Transparent Order Pipeline Scheduling System Supplier Module Assembly Driving School Bulls-eye Suppliers Prerequisite: Customer Driven “Limited” Build Combinations Shipping Marketplace Integrated Internal Supplier ASRS Marketplace 1.5 hours 2 Hrs Body Shop Paint Shop Final Area Dearborn Stamping Pre-Delivery 1 Hour Customer Order & Pick-up Center 3 Hours in System 4.5 Hours in System 7 Hours in System I Integrated Internal Supplier 2 Hrs Dearborn Frame Integrated Internal Supplier 2 Hrs Dearborn Engine/Power Train Strategic Supply Initiative

  5. Draft Proposal Heritage Integrated Lean Matrix Organization External Indicators PRODUCT DEVELOPMENT MENTORS VARIABLE REDUCTION TEAMS Core Team Members NATURAL WORK GROUPS Internal Measurable Process & Procedures PLANT IMPLEMENTATION TEAMS VOGO MENTORS

  6. Plant Infrastructure: Drive the upward spiral – Understand the “dark side” Joint Implementation Disconnects Negotiated Change Planned Intervention Opposition Shared Vision Cynicism Fear Leadership Inaction