1 / 45

Ritter Arena Improvements

Ritter Arena Improvements. Joe Cooper Dan Crossen Diego Guinea Alex Peterson Mike Walsh. Projects 1 & 2: Reclaiming Wasted Energy. Dan & Mike. Project 1: Using Wasted Heating for Heating Needs. Daniel Crossen. Current System. 65-90°F. 70-95°F.

claus
Download Presentation

Ritter Arena Improvements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ritter Arena Improvements Joe Cooper Dan Crossen Diego Guinea Alex Peterson Mike Walsh

  2. Projects 1 & 2: Reclaiming Wasted Energy Dan & Mike

  3. Project 1: Using Wasted Heating for Heating Needs Daniel Crossen

  4. Current System 65-90°F 70-95°F Semi-warm water leaving pumps/entering cooling towers at 70-95° F and leaving cooling towers/entering pumps (for cooling) at 65-90°F Cold water leaving pumps/entering underslab (for warming of ground)at 36° F and leaving underslab/entering pumps at 32°F Currently, these two systems do not interact, other than through the pumps. However, the semi-warm water is only used to cool the pumps, and does not come into contact with the cold water at all.

  5. Current System (cont’d) 65-90°F 70-95°F RIT pays to cool down this water from 65°-90°F to 45°-55°F while… …in the next room, we pay to heat up this water from 32° to 36°F They are on two separate loops, never coming into contact, and energy is wasted moving their temperatures in opposite directions.

  6. System Overview: Using Waste Heat for Heating Take the output of this system (65-90°F) 65-90°F 65-90°F 70-95°F 70-95°F And take the output of this system (32 °F) And put them through a heat exchanger to utilize the waste heat/cold from one system to heat/cool the other system

  7. Functional Flow Diagram

  8. Functional Interfaces

  9. Benchmarks

  10. Specifications / Metrics

  11. House of Quality

  12. House of Quality Summary

  13. Staffing

  14. Project 2: Using Waste Cooling for Air Conditioning Mike Walsh

  15. Waste Cooling for Air Conditioning

  16. Functional Decomposition

  17. Specifications / Metrics

  18. Staffing

  19. Customer Feedback • Presented Design to Customer • Customer thought it would be a great idea for savings, but probably impractical unless the savings were immense. • Requires 400+ feet of piping 1-1/4” Lines • Also would require stronger pumps for underslab system. • Not really in the scope of MSD I or II • Perhaps MSD VIII

  20. Arena Schematic Air Handler 3 Air Handler 1 At least 200 feet of piping in each direction Corner Crew Underslab System Air Handler 2 Air Handler 4

  21. Projects 3& 4: Using the Ice Pile Joe & Diego

  22. Project 3: Using the Ice Pile for Air Conditioning Joseph Cooper

  23. Functional Decomposition

  24. Benchmarking • Scaled Goals: • 1/5 size of Ice Bear unit • Similar output to portable a/c unit • Project Goals: • Same output as Ice Bear • Energy usage without freezing ice.

  25. Metrics

  26. Ice In 0.51 m 0.31m Cool Air Out C 0.25m A B Warm Air In Ice box/container (~1/2 total unit) Air passage/duct w/ heat exchanger (~1/4 total unit) Pump/component area (~1/4 total unit)

  27. House of Quality

  28. Staffing

  29. Customer Feedback • Customer would like to find purpose for meltwater • Using “Heat Pipes” with a pre charged coil that will migrate depending on the delta-V between cold & hot side. • Is interested in the future possibility of using snow during the winter as well.

  30. Project 4: Using the Ice Pile for Pipe Cooling Diego Guinea

  31. System Overview

  32. Functional Decomposition

  33. Function Interface

  34. Benchmark Heat Exchanger Flow Rate: 800 GPM Cooling Coil Temperature Sensor Temperature Range: -50oC to 200oC Applicable flow velocity: Less than 4 m/s Time Constant: 50s

  35. House of Quality

  36. Staffing

  37. Project 5: Monitor and reduce CO emissions in Ritter Arena Alex Peterson

  38. Functional Decomposition Output results and warnings Air Temperature Write data and check against appropriate range Emissions Log File Fan Speed Read all sensors COLevel Make adjustments if needed Fan Speed Parameters Load log and parameter files Check if adjustments happened Emissions Log File Fan Health Check Hardware Availability Check against CO2 required ventilation Sensor Health Hardware log Health Hardware log Health

  39. Benchmarking

  40. Metrics

  41. House of Quality

  42. Staffing

  43. Customer Feedback • Use handheld detector(s) to measure • Map arena well to find hotspots of emissions • Place sensor in worst part • Interface with controller may be possible if bill of materials and design complete

  44. Questions?

More Related