Release 1 Life Cycle Architecture (LCA) Review CI Risk Management Cyberinfrastructure IO August 2010 1
CI Risk Summary Overview • Total of 29 Active Risks • High – 7 • Medium – 17 • Low – 5 • Emerging – 30 • Distributed amongst Subsystems and functional areas • COI – 17 CEI – 4 DM – 5 • EOI – 6 S&A – 4 IPAA – 9 • UX – 6 Dev – 1 O&M – 2 • Sys Eng – 3 Sys Arch – 3 • Terrestrial CyberPop Network - 1
Total of 8 Active Risks High – 0 Medium – 6 Low – 2 Emerging - 9 COI Subsystem
Total of 2 Active Risks High – 0 Medium – 2 Low – 0 Emerging - 2 CEI Subsystem
Total of 3 Active Risks High – 3 Medium – 0 Low – 0 Emerging – 2 DM Subsystem
Total of 2 Active Risks High – 0 Medium – 1 Low – 1 Emerging – 4 EOI Subsystem
Total of 2 Active Risks High – 2 Medium – 0 Low – 0 Emerging – 2 S&A Subsystem
Total of 2 Active Risks High – 1 Medium – 1 Low – 0 Emerging – 7 IPAA Subsystem
Total of 2 Active Risks High – 0 Medium – 2 Low – 0 Emerging – 4 UX Subsystem
Total of 1 Active Risk High – 0 Medium – 1 Low – 0 Emerging – 0 Terrestrial CyberPop Network