1 / 14

CCC

André Welker Bruno Bauss , Volker Büscher, Reinhold Degele , Sascha Krause, Yong Liu, Lucia Masetti, Uli Schäfer, Rouven Spreckels , Stefan Tapprogge , Rainer Wanke. CCC. CALICE electronics and DAQ Meeting DESY Hamburg, Dec . 10, 2012. Aim:

Download Presentation

CCC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. André Welker Bruno Bauss, Volker Büscher, Reinhold Degele, Sascha Krause, Yong Liu, Lucia Masetti, Uli Schäfer, Rouven Spreckels, Stefan Tapprogge, Rainer Wanke CCC CALICE electronicsand DAQ Meeting DESY Hamburg, Dec. 10, 2012

  2. Aim: • New configuration interface via Ethernet • to set the four different running modes • Improve stability • Additional commands and read-back of status New design for CCC ETH André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 2

  3. Mezzanine on an Kintex 7 Evaluation-Board: FPGA-controlled CCC board: CCC atthetestbeam (front): Current (Mz) versionof CCC CCC atthetestbeam (top): André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 3

  4. 6U-VME Fan-out board: 2. Fan-out board layout: Fan-out boardatthetestbeam: Fan-out André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 4

  5. 6U-VME standard (initially double width) 3 HDMI (SYNC, ASYNC, USER/optionallyinto DAQ) 6 LEMO-connectors (3 TTL IN/OUT) (TRIG, SPILL, IN3; BUSY, OUT2,OUT3) Controlthe CCC overtheEthernet CCC: Currentdevelopment André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 5

  6. SYNC ASYNC New CCC USER TTL IN ETH TTL OUT Zedboard André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 6

  7. Four main modes and 13 configuration commands: (e.g. status, manual trigger, hold trigger, pass trigger, rising edge, reset) Spill only: Busy only: Spill main busy: Spill and busy: 42 62 Test-mode ILC-mode Testbeam-mode Test-mode U Modes 62 42 42 62 62 x 42 62 62 42 t André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 7

  8. Four main modes and 13 configuration commands: (e.g. status, manual trigger, hold trigger, pass trigger, rising edge, reset) Spill only: Busy only: Spill main busy: Spill and busy: 42 62 ILC-mode(TB data ctrl) TB-mode: config. read out time TB-mode: config. data rate Test-mode U Modes 62 42 42 62 62 x 42 62 62 42 t André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 7

  9. Four main modes and 13 configuration commands: (e.g. status, manual trigger, hold trigger, pass trigger, rising edge, reset) Spill only: Busy only: Spill main busy: Spill and busy: 42 62 ILC-mode(TB data ctrl) TB-mode: config. read out time TB-mode: config. data rate Test-mode U Modes Start acquisitionfallingedgeofspill 62 42 42 62 62 x 42 62 62 42 t André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 7

  10. Four main modes and 13 configuration commands: (e.g. status, manual trigger, hold trigger, pass trigger, rising edge, reset) Spill only: Busy only: Spill main busy: Spill and busy: 42 62 ILC-mode(TB data ctrl) TB-mode: config. read out time TB-mode: config. data rate Test-mode U Modes Start acquisitionfallingedgeofspill Stopacquisitionrisingedgeofspill 62 42 42 62 62 x 42 62 62 42 t André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 7

  11. Four main modes and 13 configuration commands: (e.g. status, manual trigger, hold trigger, pass trigger, rising edge, reset) Spill only: Busy only: Spill main busy: Spill and busy: 42 62 ILC-mode(TB data ctrl) TB-mode: config. read out time TB-mode: config. data rate Test-mode U Modes Start acquisitionfallingedgeofspill Stopacquisitionrisingedgeofspill 62 42 42 62 62 x 42 62 62 42 t André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 7

  12. Four main modes and 13 configuration commands: (e.g. status, manual trigger, hold trigger, pass trigger, rising edge, reset) Spill only: Busy only: Spill main busy: Spill and busy: 42 62 ILC-mode(TB data ctrl) TB-mode: config. read out time TB-mode: config. data rate Test-mode U Modes Start acquisitionfallingedgeofspill Stopacquisitionrisingedgeofspill 62 42 42 62 62 x 42 62 62 42 t André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 7

  13. Four main modes and 13 configuration commands: (e.g. status, manual trigger, hold trigger, pass trigger, rising edge, reset) Spill only: Busy only: Spill main busy: Spill and busy: 42 62 ILC-mode(TB data ctrl) TB-mode: config. read out time TB-mode: config. data rate Test-mode U Currentopmodes Start acquisitionfallingedgeofspill Stopacquisitionrisingedgeofspill 62 42 42 62 62 x 42 62 62 42 t André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 7

  14. Mz Group is growing • Currently busy moving into the new detector lab • Zynq based CCC under development • PCB design almost finished (R.D. and A.W.) • Software and firmware development under way (S.K. and R.S.) • Further last minute input welcome Status/nextsteps Thank you for your attention! André Welker, CALICE electronics Meeting, DESY, Dec. 10, 2012 8

More Related