90 likes | 186 Views
Site Restoration Ron Gilius. Well Site Restoration Report. Filed within 60 days after Site Restoration OG-00075. Section A – Operator and Well Information. Section B – Land Application of Tophole Water. Date of Application Volume Discharged pH and Specific Conductance.
E N D
Well Site Restoration Report Filed within 60 days after Site Restoration OG-00075
Section A – Operator and Well Information Section B – Land Application of TopholeWater • Date of Application • Volume Discharged • pH and Specific Conductance
Section C – Off-Site Waste Disposal • Residual Waste – Off-Site Disposal • Type of waste • Amount of Waste • Receiving Facility • Name • Permit # • Name and Address of Hauler
Section D – On-Site Disposal – Drill Cuttings or Waste • Locate the Center in degrees and the distance from • the well head • Type of materials • Drill Cuttings above the casing seat • Drill Cuttings below the casing seat • Cement Returns • Drilling muds • Frac sands • Other
Section E - Site Restoration • Earth Disturbance Activities Complete • - Site Restoration Complete • - Stormwater BMPS • - Permanent Stabilization
Section F - Pit Disposal • Pit Dimensions • Procedures to Close Pit • Material and Thickness of subbase and Pit liner • Liner Manufacturer
Section G – Land Application • Length and Width of Application Area • Ratio of Waste to Soil (not to exceed 1:1) • Chemical Analysis If Requested • (Oil and Gas Operator’s Manual)
Joe Umholtz, Chief, Division of Resource Management & Well Development Department of Environmental Protection Rachel Carson State Office Building 400 Market Street | Harrisburg, PA 17101 Phone: 717.772.2199 | Fax: 717.772.2291 www.depweb.state.pa.us Skidding the Rig??