Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes. Cable Storage Racks for Norfolk Naval Shipyard. Design Concepts. Static Rack - No moving parts - 4-Cell design -  Sturdy, simple construction -  Bolted connections for easy disassembly

colin-gates
Download Presentation

Cable Storage Racks for Norfolk Naval Shipyard

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes Cable Storage Racks for Norfolk Naval Shipyard

  2. Design Concepts • Static Rack - No moving parts - 4-Cell design -  Sturdy, simple construction -  Bolted connections for easy disassembly -  Some welding required

  3. Design Concepts • Dynamic Rack - Moving Parts - More involved construction - Bolted and welded connections - Damper mechanism

  4. Design Direction • Static Design -  Cheaper to construct - Negligible maintenance - Easy to repair - Safer - Approximately the same spool capacity as the Dynamic Rack

  5. Design Conditions • Increase Accessibility • Increase Capacity • Reduce exposure to the elements

  6. Connections • Both welded and bolted connections • End plate to distribute loads applied to HSS Column • I-beams are bolted for easy assembly and disassembly

  7. PATRAN Analysis • Maximum displacement: 0.0575”

  8. PATRAN Analysis • Bending Stress: 6710 psi

  9. PATRAN Analysis • Axial Stress: 1270 psi

  10. SolidWorks Model

  11. Remaining Goals • Consult Shipyard • Finish design • Cost and Labor Analysis • CAD blueprints

  12. Gantt Chart

  13. Questions?