110 likes | 121 Views
Learn about the Northern Powerhouse Rail Network, including reduced journey times, increased capacity, and key studies influencing the project. Specifics on the Leeds to Newcastle route and North East rail issues are also covered.
E N D
PowerPoint TitleSub heading if required Northern Powerhouse RailFreight meeting 17th May 2016
Powerhouse Rail Network • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy
Conditional outputs • Reduced journey times between cities • Increased capacity to cater for economic growth forecasts • Minimum city to city connectivity frequencies • For NECA starting point 4 additional trains per hour cutting the journey time Newcastle to Leeds from 90 minutes to 60 minutes and providing 100% to 130% capacity increase • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy
Other related rail studies / influences • HS2 • East Coast Route Study • North East Route Study • TfN Local Strategic Connectivity workstream • TfN Freight workstream • SEP projects / aspirations • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy
Leeds to Newcastle Specifics • increased rail services • Capacity uplift 100% to 130% • Reduce journey times from 90mins to 60mins • Minimum frequency 4tph • Infrastructure and Station workshops as part of EC route study • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy Freight Trans-Pennine CrossCountry LDHS Local HS2 NPR
CONCEPT A and B Newcastle Hull Leeds Manchester Vic New Northern Powerhouse Rail route Upgraded current NR route (could be very long cut-offs) Concept B (northern) Current NR route Link provided to access HS2 route HS2 Concept A Manchester Pic Liverpool Concept B (southern) New or upgraded route Sheffield (Midland) Manchester Airport
CONCEPT C Newcastle Hull Leeds Manchester Vic New Northern Powerhouse Rail route Upgraded current NR route (could be very long cut-offs) Current NR route Link provided to access HS2 route HS2 Manchester Pic Liverpool New or upgraded route Sheffield (Midland) Manchester Airport
North East issues • Quantum of trains proposed on existing lines difficult (expensive) to achieve (including Freight) • Removal of constraints/ New line / significant cut offs / upgrade Leamside • Station capacities • Cost – vs – Benefits of calling at other centres of economic significance • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy
Removal of Constraints / New lines / Cut Offs / Upgrades • Options under consideration • Sections of 4 track railway • Reduce delay at Junctions • Reduce delay at Intermediate Stations • Use of Leamside • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy
Programme milestones • Autumn Statement / Spring Statement • Aim to sift options to provide small number of alternatives on each corridor for high level model testing / engineering feasibility / costing. • Agreed methodology of comparing corridor options and ranking them. • Agreed methodology for sequencing between corridors. • East Coast route study to publish for consultation in December