1 / 27

Softwire wg

Softwire wg. Alain Durand, Comcast David Ward, Cisco. Note Well.

Download Presentation

Softwire wg

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Softwire wg Alain Durand, Comcast David Ward, Cisco

  2. Note Well Any submission to the IETF intended by the Contributor for publication as all or part of an IETF Internet-Draft or RFC and any statement made within the context of an IETF activity is considered an "IETF Contribution". Such statements include oral statements in IETF sessions, as well as written and electronic communications made at any time or place, which are addressed to: the IETF plenary session, any IETF working group or portion thereof, the IESG, or any member thereof on behalf of the IESG, the IAB or any member thereof on behalf of the IAB, any IETF mailing list, including the IETF list itself, any working group or design team list, or any other list functioning under IETF auspices, the RFC Editor or the Internet-Drafts function All IETF Contributions are subject to the rules of RFC 3978 and RFC 3979. Statements made outside of an IETF session, mailing list or other function, that are clearly not intended to be input to an IETF activity, group or function, are not IETF Contributions in the context of this notice. Please consult RFC 3978 for details.

  3. Wg status • Charter went to internal & external review • Comments received • Chairs, AD & IESG members started addressing the comments… • …AD had a baby! (Congratulation!) • As of this morning, we are approved as a wg by the IESG! • Secretariat still needs to make it formal

  4. Agenda • Overview of meeting in Paris (Chairs) • Hub and Spoke Problem Overview (Durand) • Hub and Spoke Illustration (Miyakawa, Palet, Williams) • Mesh Problem Overview (Ward) • Mesh Illustration (Li) • Status of draft problem statement (Chairs) • Next steps (Chairs, all)

  5. Paris Interim Meeting • We held an interim meeting in Paris on October 11th-12th • 18 participants, intense discussions, very productive meeting • Focus on problem statement • draft-durand-softwire-problem-statement-00.txtedited in rush just before the cut-off date (excuse typos…) • 2 problems identified, topology driven: • Access network, customer initiated, one exit path [Hubs & Spokes] • Core network, ISP initiated, complex routing topology [Mesh] • We will look at both problems independently • Hopefully, they will share enough common technology

  6. Hub & Spoke Description

  7. Hubs & Spokes Problem • Description: • Access network problem, customer initiated, one exit path • Applicability: • ISPs with Dual Stack core and a number of dual stack Points of Presence (“Hubs”) where they connect their customers. • 3 usage cases have been identified: • the networks between the CPE router and the hub supports only one address family. • the CPE router cannot be easily upgraded to support both address families, a softwire is created from a node behind the CPE router • Same, but initiated from another router behind the CPE router

  8. Softwire Concentrator Usage Case 1 Dual AF Single AF CPE Router Dual AF Softwire Initiator

  9. Softwire Concentrator Usage Case 2 Dual AF CPE Router Single AF Dual AF Host Softwire Initiator

  10. Softwire Concentrator Usage Case 3 Dual AF CPE Router Single AF Dual AF Router Softwire Initiator

  11. Hubs & Spokes Assumptions • NAT/PAT (in IPv4) is present • Not always upgradeable CPE router • “Stable” IPv6 prefix desired • Softwires initiated by customer • Customer side: softwire initiator • May be a host or a router • ISP side: softwire concentrator • Routing: • default route from softwire initiator to concentrator • (CPE routers do not generally run a routing protocol, but the softwire solution will work even if it does.)

  12. Hubs & Spokes Properties (1) • Scaling: • to the millions of softwire customers • Set-up time (a.k.a. “latency”) • A fraction of the total set-up time of the CPE router • Multicast • Classic multicast solution run over the softwire

  13. Hubs & Spokes Properties (2) • Security • Must support secure user authentication • May be turned off. • Must be able to support payload security when desired outside of the softwire mechanism • Operation And Management • Keep alive • Usage accounting • End point failure detection (inner address of the softwire) • Path failure detection (outer address of the softwire)

  14. Hubs & Spokes Encapsulations • Critical path • IPv6/IPv4 • IPv6/UDP/IPv4 • IPv4/IPv6 • Other encapsulations to be supported later(e.g. IPv6/IPv6)

  15. Hub & Spoke Illustrations Slides from Shin, Carl & Jordi

  16. Mesh Description

  17. Mesh Problem • Description: • Core network problem, ISP initiated, complex routing topology • Applicability: • ISPs (or large enterprise networks acting as ISP for their internal resources) establish connectivity to 'islands' of networks of one address family type across a transit core of a differing address family type.

  18. IPv4 Access Island IPv4 Access Island BGP Dual-Stack AFBR BGP Dual-Stack AFBR IPv6 Access Network IPv6-only Transit Core IPv6 Access Network BGP Dual-Stack AFBR BGP Dual-Stack AFBR IPv4 Access Island IPv4 Access Island Mesh Diagram

  19. AFBR • To provide reachability across the transit core dual-stack devices are installed that act as "Address Family Boundary Routers”. • Creates a limited dual-stack edge network • Core can be solely one AF and islands don’t require upgrade • AFBR provide peering across AS or within an AS • Can be used inconjunction w/ route reflectors

  20. Full Mesh Overlay for Many2Many connnectivity V4 island V6 transit AFBR V4 island AFBR AFBR V4 island

  21. May have different encaps available V4 island V6 transit core AFBR MGRE,L2TPv3 L2TPv3 MGRE V4 island AFBR L2TPv3 MPLS IPsec AFBR MGRE IPsec V4 island Must have solution to allow for negotiation and preference of encap

  22. Must support Applications…. L3-VPN using 2547bis Route Reflector VPN V4 island V6 transit AFBR V4 island AFBR AFBR V4 island VPN VPN

  23. Mesh properties (1) • Scaling • Number of AFBR related to the number of islands and exit points from islands (x0-x00 islands) • We know of no cases of x0000++ islands • Full routing table needs to be supported • Islands can carry x00000 of routes • Services / Encapsulation • v4/v6 or v6/v4 • L2VPN • L3VPN (overlapping address spaces) • Multicast a must in all cases • Security • No “user” authentication • Authentication for control plane • may be turned off • Support for IPsec in data plane (outside of softwires)

  24. Mesh properties (2) • Operation And Management • No need for keepalive • Usage accounting • End point failure detection • Path failure detection • Flexible encapsulation possibilities • Interconnection at L2 or L3 • Cannot require full mesh of all AFBRs under all circumstances

  25. Mesh Illustrations Slides from Pr Li

  26. Problem Statement Draft Status • Problem statement described in draft-durand-softwire-problem-statement-00.txt • Comments received on the ML • Typos • Some minor stuff • n engineer that comes up with n+1 design syndrome • 3 issues raised about the Mesh problem: • Scale • Presented today • Should this be solved at layer 2 or layer 3 • Crystal ball says both (This belongs to the solution space) • Should the softwires be initiated from the PE or CPE or both? • Crystal ball says most commonly PE (for mesh)

  27. Next Steps • Mark finish the creation of the wg! • Done, minor nits on charter + secretariat action • Rev problem statement draft • draft-ietf-softwire-problem-statement-00.txt Nov. 14th • draft-ietf-softwire-problem-statement-01.txt Dec. 1st • WG Last Call on problem statement draft • Target: Dec. 8th • Interim meeting on solution space (Jan/Feb 06) • Last was in Europe, Hong Kong?

More Related