260 likes | 382 Views
Ang Tide Right Vessel for Complex Diving Operations. Right Vessel - Right Time Configured for Multi-Purpose Diving Ops Close In Around the Clock Platform Operations Submarine Cable Installation Cable Lay Survey & Monitoring Riser Assembly & Construction Trenching Operations
E N D
Right Vessel - Right Time • Configured for Multi-Purpose Diving Ops • Close In Around the Clock Platform Operations • Submarine Cable Installation • Cable Lay Survey & Monitoring • Riser Assembly & Construction • Trenching Operations • Diver Hand Held Trenching Capability • Deep Power Trenching • ROV Operations • Mini-Survey Operations • Cable Lay In Trench Assessment
No Off Shore Complex too Tight • Superb DP2 Positioning • Diving Operation, In, Under & Over • 24 Hr Operations • 26 Divers on Multiple Shifts • Three Decompression Chambers • 12 Helium Bottle Assembly • 12 Oxygen Bottle Assembly
Trenching / Mat Laying Operations • Monitor Cable • Pipe Line Depth • Pipe Line Crossings • Bottom Mat Lay Downs • Cable Uroduct Application • Top Mat Lay Downs
Extreme In Close Support Close In Positioning Allowing Diving Operation Penetration Any Where a Diver Needs to Go
Submarine Cable OperationsPower & Fiber Optics Extensive Experience in: Submarine Cable Laying Riser Construction Platform Termination Complex Infrastructure Pipe Crossing Protection Mat Positioning & Uroduct Protection