1 / 19

A Discussion of the Compatibility of the National S ignalling System with ETCS

A Discussion of the Compatibility of the National S ignalling System with ETCS. MEHMET TURŞAK Head of Facilites Division. TCDD – Signalling Coverage. %3 3 , 44 Si gnalled line percentage. 12.000 km total rail line length *. 4.016 km signalled rail lines *. %27,2

colton
Download Presentation

A Discussion of the Compatibility of the National S ignalling System with ETCS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Discussion of the Compatibility of the National Signalling System with ETCS MEHMET TURŞAK Head of Facilites Division

  2. TCDD – Signalling Coverage %33,44 Signalled line percentage 12.000 km total rail line length* 4.016 km signalled rail lines* %27,2 Signalled line percentage on conventional lines 2 * 11.Ulaştırma Şurası Çalışma Grupları Rapor Özetleri Belgesi

  3. TCDD Signalling Issues The need to develop a national signalling system

  4. HISTORY

  5. YERLİSİNYAL PROJECTS Scope • Interlocking Systems • Station Areas • Open Lines • Centralized Traffic Control • Central Control Center • Local Control Desks • Regional Control Centers

  6. YERLİSİNYAL PROJECTS • Goals • Safety • Cost Effectiveness • Cost effective upgrades and maintenance • Based on COTS components • Requirements gathered by consulting with all levels of users within TCDD • To deploy signalling in unsignalled lines

  7. ORTAKLAR – DENİZLİ PROJECT (YERLİSİNYAL.09)

  8. AFYONKARAHİSAR – DENİZLİ - ISPARTA PROJECT (YERLİSİNYAL.03)

  9. YERLİSİNYAL PROJECT Coverage Areas

  10. YERLİSİNYAL Project & ETCS YERLİSİNYAL is being deployed on conventional lines

  11. YERLİSİNYAL Project & ETCS An ETCS Level 1 / 2 Compliant YERLİSİNYAL System

  12. YERLİSİNYAL Architecture

  13. YERLİSİNYAL & ETCS Level 1

  14. YERLİSİNYAL & ETCS Level 2

  15. YERLİSİNYAL & ETCS Level 3

  16. YERLİSİNYAL Project & ETCS

  17. Primary Goals

  18. ROAD MAP

  19. THANK YOU

More Related