A Discussion of the Compatibility of the National Signalling System with ETCS MEHMET TURŞAK Head of Facilites Division
TCDD – Signalling Coverage %33,44 Signalled line percentage 12.000 km total rail line length* 4.016 km signalled rail lines* %27,2 Signalled line percentage on conventional lines 2 * 11.Ulaştırma Şurası Çalışma Grupları Rapor Özetleri Belgesi
TCDD Signalling Issues The need to develop a national signalling system
YERLİSİNYAL PROJECTS Scope • Interlocking Systems • Station Areas • Open Lines • Centralized Traffic Control • Central Control Center • Local Control Desks • Regional Control Centers
YERLİSİNYAL PROJECTS • Goals • Safety • Cost Effectiveness • Cost effective upgrades and maintenance • Based on COTS components • Requirements gathered by consulting with all levels of users within TCDD • To deploy signalling in unsignalled lines
ORTAKLAR – DENİZLİ PROJECT (YERLİSİNYAL.09)
AFYONKARAHİSAR – DENİZLİ - ISPARTA PROJECT (YERLİSİNYAL.03)
YERLİSİNYAL Project & ETCS YERLİSİNYAL is being deployed on conventional lines
YERLİSİNYAL Project & ETCS An ETCS Level 1 / 2 Compliant YERLİSİNYAL System