An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CALO piquet report 26/07 – 29/08/2012 • July 24 - 31 Yuri • July 31 - Aug. 07 Evgeny • August 07 - 14 Irina • August 14 - 21 Rustem • August 21 - 28 Tengiz • Aug. 28 – Sept. 04 Marie-Noelle 29/08/2012 Tengiz

  2. 29/08/2012 Tengiz 2

  3. Very smooth data taking during this period. • no Power glitches • no HW problems and interventions • 1. HCAL HV recipe update based on LED data 29-Jul, 4-Aug, 18-Aug and 24-Aug. • HCAL 137Cs calibration 27-Aug CANCELED and postponed to the next TS (middle of Sept.) • 2. FakeSignals warnings in SPD at run change. Time to time reported by DM. • 3. Gain variations warnings in ECAL during long fill 3002 (>12h), usual ~350 disqualified channels slowly transformed into more then 500 disqualified channels, producing alarm state. 3 29/08/2012 Tengiz

  4. FakeSignals warnings in SPD at run change. Time to time reported by DM. 4 29/08/2012 Tengiz

  5. Gain variations alarm in ECAL To temporary avoid continuous alarm on Ecal gain monitoring the threshold has been modified by Olivier D. ECAL gain update necessary to compensate cumulative aging. This work is planned during current week. 5 29/08/2012 Tengiz