An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NERC Report Jerry Rust WECC October 21, 2010

  2. BARC • Elimination of Manual Time Error Correction – Field Test • Frequency Response Initiative • Event Analysis Program

  3. BARC

  4. Balancing Authority Reliability-based Control (BARC) • BARC will propose a SAR to address issues with four BAL standards. The purpose of the set of four standards is to ensure that BAs take action to maintain interconnection frequency with each BA contributing its fair share to frequency control without burdening transmission facilities with excessive imbalances of load and generation.

  5. Balancing Authority Reliability-based Control (BARC) • The SAR is intended to address • FERC Final Rule “Mandatory Reliability Standards for the Bulk-Power System, FERC Order 693” on the NERC standards BAL-002, 004, 005, and 006 • To specify the Time Error Correction, special Area Control Error cases, and Inadvertent Interchange reliability requirements/business practices with NERC and NAESB collaborative participation • To incorporate the necessary content, structure, and language to comply with the NERC standard process

  6. Balancing Authority Reliability-based Control (BARC) The SAR expands on the work already under way with the BAL-004, 005, 006 SARs by requiring that BAL-002, 004, 005, and 006 be upgraded in accordance with the NERC Reliability Standards Development Plan

  7. Manual Time Error Correction – Field Test

  8. Manual Time Error Correction – Field Test • Proposed Field Test for all Interconnections • Effective January 1, 2011 • BAL-004 • R2. The Interconnection Time Monitor shall monitor Time Error and shall initiate or terminate corrective action orders in accordance with the NAESB Time Error Correction Procedure • Field Test – suspend NAESB thresholds for Time Error Correction Procedure. • Impact – All interconnections

  9. Manual Time Error Correction – Field Test • WECC to present a minority opinion report at the NERC OC recommending that the Interconnections should be able to elect through their respective process whether or not to participate in a Field Test • Goal • Let one Interconnection learn if there are issues • Frequency based timing for metering • Frequency time devices – Traffic Control • Others • Impact – The Consumers

  10. Frequency Response Initiative

  11. Frequency Response Initiative – New Terms Minimum Reliable Interconnection Frequency Response Frequency Response Obligation Frequency Response Measure Single Event Frequency Response Data

  12. Frequency Response Initiative – Proposed Time Line - 2010 • March 18 – FERC Order sets 6-month deadline to modify BAL-003 (later extended one month). • July 23 – Post proposed modifications to BAL-003 for 45-day period. • November 15 – Post drafting team response to comments. • November 30 – Post proposed modifications for 30-day period.

  13. Frequency Response Initiative – Proposed Time Line - 2011 • January 23 – Post proposed standard for pre-ballot. • March 6 – Post Drafting Team’s reply to comments. • March 21 – Post recirculation ballot. • April 25 – Receive NERC Board approval. • June 11 – File documents with appropriate regulatory authorities. Impact and Coordination with BARC

  14. Event Analysis Program

  15. Event Analysis Program –Goals Promoting Reliability Developing a Culture of Reliability Excellence Collaboration Being a Learning Organization

  16. Event Analysis Program –Document Electric Reliability Organization Event Analysis Process www.nerc.com/docs/eawg/Event_Analysis_process_WORKINGDRAFT_100110-Clean.pdf Field Test Follow-up Webinar will be held to discuss the results of the field test an to present the final version of the document for use by the industry

  17. Questions