An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Division of Right of Way & Utilities Kentucky Transportation Cabinet

  2. Division of Right of Way & Utilities WHO ARE WE?

  3. Division of right of way and utilities Acquisition Branch Appraisal Branch Relocation Branch Utilities & Rails Branch Utility Coordination Rail Coordination Section 130 Rails Program • Keith McDonald, • Director - Division of Right of Way & Utilities • David Orr, • Acquisition Branch Manager • Eric Monhollon, • Appraisal Branch Manager • Marybeth Johnson, • Relocation Branch Manager • Jennifer McCleve, • Utilities/Rails Branch Manager

  4. Managing Utility & Railroad Impacts on KYTC Roadwork

  5. We permit utilities in Kentucky’s ROW because we need them, they are infrastructure.

  6. in·fra·struc·ture, n. • the underlying foundation or basic framework • the system of public works of a country, state, or region;

  7. KYTC & Utility Companies Move goods and services Consumers : taxpayers / ratepayers Essential elements of the INFRASTRUCTURE.

  8. HOW DO WE PROTECT THEM? • Location! Location!! Location!!! – We need to know where they are by: • Reviewing plans • Contacting Utilities • Determining any conflicts and developing a plan of action to protect them • By Developing Utility Impact Note (aka Utility Clearance Note)

  9. REQUIREMENTS FOR UTILITY NOTES FEDERAL REQUIREMENT ? TITLE 23 CFR 635.309(c)(b) Table of Contents PART 635 - CONSTRUCTION AND MAINTENANCE Sec. 635.309 Authorization. Subpart C- Physical Construction Authorization

  10. REQUIREMENTS FOR UTILITY NOTES TITLE 23 CFR 635.309(c)(b) PART 635-CONSTRUCTION AND MAINTENANCE Subpart C--Physical Construction Authorization Sec. 635.309 Authorization. • Authorization to advertise the physical construction for bids or to proceed with force account construction thereof shall normally be issued as soon as, but not until, all of the following conditions have been met:

  11. REQUIREMENTS FOR UTILITY NOTES (b)A statement is received from the State, either separately or combined with the information required by Sec.635.309(c), that either all right-of-way clearance, utility, and railroad work has been completed or that all necessary arrangements have been made for it to be undertaken and completed as required for proper coordination with the physical construction schedules.Where it is determined that the completion of such work in advance of the highway construction is not feasible or practical due to economy, special operational problems and the like, there shall be appropriate notification provided in the bid proposals identifying the right-of-way clearance, utility, and railroad work which is to be underway concurrently with the highway construction.

  12. Utility Clearance NotesDistrict Utility Section can draft given: - Project Manager has need- Time to identify / address impacts- Project data to perform analysis- Completed request form TC69-12TC 69-12.pdf

  13. Utility Clearance NotesProject Manager can draft given: - Project Manager has assessed Existing utilities in area Compared to project plan - No utility impacts exist- No additional ROW needed- Use: HSIP-Maint Clearance Note.docx

  14. STATE REQUIREMENT ? • There are no specific legislative requirements For utility notes on State funded projects, but as a general rule Utility Notes should be submitted on all PS&E projects. • There is, however, a Kentucky legislative requirement for protection of Utilities during construction or excavation activities known as: “The Kentucky Dig Law”.

  15. KRS 367.4901 Legislative declaration (Short title for KRS 367.4901 to 367.4917.) The General Assembly finds that the objective of underground facility damage prevention and the resulting benefits of public and workplace safety and protection of consumer services require an effective underground damage prevention procedure.KRS 367.4901 to 367.4917, which may be cited as the "Underground Facility Damage Prevention Act of 1994," are created to provide for this procedure and accomplish this objective.

  16. Preparing for ConstructionKYTC is obligated to call KY811 for dig activitiesKENTUCKY CALL BEFORE YOU DIG LAW.docx

  17. Preparing for ConstructionThe requirements of KRS 367.4905 to 367.4917 shall not apply to …Routine road maintenance “Routine road maintenance” means preservation…road repairs…resurfacing, but does not include road construction or penetration of existing grade;

  18. RAILROAD COORDINATION Utilities is involved in highway projects in order to: Acquire rights of entry Coordinate plan review with RR companies to avoid conflicts, Coordinate flagging to protect RR facilities Assure that Cabinet contractors protect Cabinet from liability (insurance and construction techniques are proper)

  19. Rails • If we cross or are near a Railroad facility, we will need to have permission in the form of a • Right of Entry Agreement • Construction Agreement • Special Cases (rare)

  20. What’s Needed of Us? • Approval of any plans/proposal • Permission to enter property • Possibly insurance • Flagging services • Provided by RR • Need to be scheduled in advance • AT LEAST 2 weeks prior to work • We pay RR for this

  21. Rails – How it Applies • Construction Projects • Mostly handled by Contractor • Bridge Maintenance • Similar to Construction • Resurfacing • Often overlooked • Early coordination is key • Months, not weeks • Contractor vs. in-house • RR Dependent

  22. Let us know • Rough crossings • Poor alignments • Anything RR related RAILROAD COORDINATION

  23. REMEMBER US ON YOUR PROJECTS! • We all share an obligation to the Public, the Utilities and the Railroads to preserve and protect these vital parts of Kentucky’s infrastructure. • We’re here to assist you to ensure your project doesn’t run into unforeseen problems regarding utility conflicts or railroads.

  24. Central Office Contacts • Utilities & Rails Branch Manager Jennifer McCleve – (502) 782-4944 • Area Utilities Coordinators: • Districts 1, 2 and 3 Dianah Waller (502) 782-4954 • Districts 4, 5, 6 and 8 Tom Capshaw (502) 782-4937 • District 9, 10 and 12 Glenda France (502) 782-4938 • District 7 and 11 Allen Rust (502) 782-4950 • Statewide Rails Coordinator - Allen Rust

  25. Don’t Hesitate To Call Us! THANKS!