An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCb LHCb Status Report (A.Vorobyov)

  2. LHCb LHCb LHCb Status Report (A.Vorobyov)

  3. MWPC production at PNPI Production at PNPI-1 is finished. Production at PNPI-2 is finished. *)The last transport to CERN is arriving November 28, 2006 with 70 M4R4. LHCb Status Report (A.Vorobyov)

  4. MWPC preparations at CERN Preparation Phase 1 Preparation Phase 2 LHCb Status Report (A.Vorobyov)

  5. LHCb Status Report (A.Vorobyov)

  6. MWPC preparations at CERN LHCb Status Report (A.Vorobyov)

  7. Preparation Phase 2 Pre-installation Test Stand 5 chambers can be tested simultaneously with the rate of 5 chambers per day LHCb Status Report (A.Vorobyov)

  8. LHCb Status Report (A.Vorobyov)

  9. Cosmic Ray Counts from Internal Counters. Thresh = 15fC. GapA in 5 chambers. Chambers M4R4 # 53, 54, 55, 56, 57 Run198 2550_0_0_0 100 sec LHCb Status Report (A.Vorobyov)

  10. LHCb Status Report (A.Vorobyov)

  11. Construction Status LHCb Spectrometer OT Muon System Magnet RICH1 VELO RICH2 Calo. System TT LHCb Status Report (A.Vorobyov)

  12. IP8 Now RICH-2 IP8 now... SPD OT Mu-system PS LHCb Status Report (A.Vorobyov)

  13. LHCb Status Report (A.Vorobyov)

  14. LHCb Status Report (A.Vorobyov)

  15. Muon wall preparation LHCb Status Report (A.Vorobyov)

  16. Further planning • In the optimistic planning with the pre-installation tests rate of 5 chambers per day, all 600 chambers could be ready for installation by the end of May,2007 However, there will be still problems with additional conditioning of the chambers ,repairs etc that may require some additional time • HV-System for 4000 channels LHCb Status Report (A.Vorobyov)