1 / 8

Quality Assurance

Quality Assurance. 16/05/06. Station assembly QA /comb - i. Comb arrived: 9 May Doublet layer arrived: 15 May Length of the scintillating fibre is about 40cm, bit short to play with comb Need to shift doublet layer on vacuum chuck

conley
Download Presentation

Quality Assurance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Quality Assurance 16/05/06

  2. Station assembly QA /comb - i • Comb arrived: 9 May • Doublet layer arrived: 15 May • Length of the scintillating fibre is about 40cm, bit short to play with comb • Need to shift doublet layer on vacuum chuck • For bundling of the fibre, better to cut the fibre to the same length • For the production version, the length of the fibre > 50 cm, will be OK 40cm

  3. Station Assembly QA - ii • Comb holder made;16 May Vacuum tube connector Comb position adjustable Scintillating fibres tangle up to comb’s slit and teeth => Needs cover on top of the comb

  4. Vacuum chuck • Vacuum pump switch • Suction on/off switch • Tube attached to vacuum chuck • Vacuum pump is quite noisy;better to move outside of the room to make a worker friendly environment

  5. Microscope with CCD • CCD • Light controller • Stage controller • Video text overlay switch • CRT

  6. Straightness check - i • Unmount vacuum chuck holder; • Be careful to this pin • Put holder on stage • Fix the holder y x

  7. Straightness check - ii • Align the vacuum chuck with alignment pinuntil the fibres on the CRT and the crosshairs on the CRT match • Then scan across the fibreto check deviation from straightness • Stage controller boot sequence; • Double clickD:/Microscan/Microscan.ht • Open MicroScan.txt on desktop • Copy texts to hyper terminal • Type “man()” then press return;a text “UNDER MANUAL CONTROL” should appear onLCD of SPECTROLAB MICROSCAN

  8. Todo • Tools and parts scattered around in the room;need to tidy the room for efficient work • PC for stage controller too slow;Windows XP running on Pentium 200MHz with 128MB memory; ridiculous10 minutes to boot; 10 minutes to shut down • Finish straightness check • Try bundling with comb

More Related