From Business Case Planning to Benefit Reality – An Industry Perspective

From Business Case Planning to Benefit Reality – An Industry Perspective. Walter Levesque Vice President, Sales Hunt Technologies, Inc. Hunt Technologies, Inc. Founded in 1985 as a research company 1994 Patented Ultra Narrow Bandwidth (UNB) Technology Located in Pequot Lakes, MN

Download Presentation

From Business Case Planning to Benefit Reality – An Industry Perspective

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. From Business Case Planning toBenefit Reality – An Industry Perspective Walter Levesque Vice President, Sales Hunt Technologies, Inc.

  2. Hunt Technologies, Inc. • Founded in 1985 as a research company • 1994 Patented Ultra Narrow Bandwidth (UNB) Technology • Located in Pequot Lakes, MN • 130+ employees • 430+ customers • 3,000,000+ endpoints

  3. Two-Way Communication Always On™ Each endpoint broadcasts information independently Near Real Time Downstream UNB Upstream Substation

  4. Primary Business Case Reasons for AMRBased on Information from Chartwell and Howard Scott Prepared: June 2002

  5. Emerging Benefits of AMR Based on Information from Chartwell and Howard Scott Prepared: June 2002

  6. Meter Reading Time-of-Use Demand – system wide Load Profiles Multi-Utility Monitoring Outage Detection Power Restoration Distribution Operations Preventive Maintenance Load/Transformer Balancing Power Quality Reduce Line Loss Control Load Control Remote Disconnect Remote Reconnect Important Deliverables

  7. Consumption Profiles • 5 minute intervals aggregated into 15 minute intervals • 15 minute intervals directed into rate periods • Support of four rate periods • Time synchronized to National Standard

  8. Consumption Profiles 12:00am 6:00 7:00 8:00 9:00 12:00pm 6:00 7:00 8:00 9:00 11:59pm 5 4 2 OFF PEAK SHOULDER PEAK $.04 $.07 $.13

  9. Meter Reading Time-of-Use Demand – system wide Load Profiles Multi-Utility Monitoring Outage Detection Power Restoration Control Load Control Remote Disconnect Remote Reconnect Distribution Operations Preventive Maintenance Load/Transformer Balancing Power Quality Reduce Line Loss Important Deliverables

  10. S/N 12380 S/N 6714 S/N 12452 S/N 6783 S/N 12370 S/N 12357 S/N 12430 S/N 12412 S/N 12323 S/N 12342 S/N 12306 End Point Information System • Power Quality • Line Loss • Transformer Balancing & Sizing • Phase Loading & Identification • Preventative Maintenance

  11. Remote Administration • Command Messaging • Demand reset • Load Control with validation • Service disconnect/reconnect with validation • Final read • Reprogram the Endpoint • Reconfigure packet type and structure • Asynchronous command to interrupt or direct consumption profile to appropriate rate period

  12. Benefits of Rapid Deployment • Improve project ROI • Reduce operational expenses • Additional data for effective/efficient engineering