1 / 18

Commissioning results of the SRF gun with Pb cathode R. Barday 14.09.11

Commissioning results of the SRF gun with Pb cathode R. Barday 14.09.11. Energy Recovery Linac BERLinPro. 32 m. Beam dump. Main linac. Merger. SRF Gun. Booster. 6 m. demonstration of the feasibility to use ERL technology for future synchrotron light sources. Undulator. 25 m.

Download Presentation

Commissioning results of the SRF gun with Pb cathode R. Barday 14.09.11

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Commissioning results of the SRF gun with Pb cathodeR. Barday14.09.11

  2. Energy Recovery Linac BERLinPro 32 m Beam dump Main linac Merger SRF Gun Booster 6 m demonstration of the feasibility to use ERL technology for future synchrotron light sources Undulator 25 m final beam parameters are determined by the performance of the electron source: SRF gun

  3. Electron source Development of the SRF gun in a staged approach • Stage A • SC cathode on the back wall • ofthe SC cavity • Pb: robust, fast response time • Work function ~(4-5) eV→ UV laser • emissionfrom a fewatomiclayers • highreflectivity • QE ~ few 10-4: toolowtoproducehighaveragecurrent • High peakcurrent, comparabletotheBERLinProrequirements • Stage B • Implementationof NC cathodewithhigh QE at VIS in the SRF gun • Stage C • High power operation

  4. Gun cavity with diagnostics beam line plasma arc deposition few hunderd nm thick Pb cathode film R. Nietubyc first electron beam 21st of April 2011 g e

  5. Vacuum system ok for Pb cathode, cavity, bad for CsK2Sb cathode Particle free assembly Beam line is not yet baked out. TSP is not yet activated Planed for October 2011… P<1E-8 mbar

  6. QE distribution g photocathode e QEmetal<10-4 Plaser~1.5 mW → Ie≤50 nA • Schottky effect (field dependent electron emission) • describes the lowering of the electron affinity (work function) • leads to an encreased electron emission (QE) phase=25 degr.

  7. QE distribution g photocathode e QEmetal<10-4 Plaser~1.5 mW → Ie≤50 nA QEmax ~ 3.6*10-5 • Schottky effect (field dependent electron emission) • describes the lowering of the electron affinity (work function) • leads to an encreased electron emission (QE)

  8. In situ laser cleaning Laser cleaning removes the contaminations from the surface. Laser cleaning improve QE in terms of absolute value and uniformity. BUT! High laser density can damage the photocathode/substrate. 7 laser cleaning runs with laser density between 0.045 mJ/mm2 and 0.23 mJ/mm2 were performed at HZB. KrF excimer laser (Xantos XS) l=248 nm (~5 eV) 5 ns pulse duration (FWHM) Repetition rate 500 Hz Cathode surface was irradiated for 10 minutes

  9. In situ laser cleaning • firstlasercleaning • energy density~0.04 mJ/mm2 • secondlasercleaning • energy density~0.09 mJ/mm2 • thirdlasercleaning • energy density~0.09 mJ/mm2 Pbcathode start laser cleaning

  10. In situ laser cleaning • before laser cleaning • QEmax~3.6E-5 • first laser cleaning • energy density~0.04 mJ/mm2 • QEmax~4.8E-5 • second/third laser cleaning • energy density~0.09 mJ/mm2 • QEmax~4.7E-5 ~factor 2.5 QEmax~30%

  11. In situ laser cleaning During 4th laser cleaning the left side of the cathode was cleaned with the energy density of 0.23 mJ/mm2 fluorescence Nb

  12. In situ laser cleaning trapped He was released during the laser cleaning Tsurface>4K?

  13. In situ laser cleaning Metal cathodes installed in the rf guns typically have lower QE than the one of the test probe. QE of the cathode is 10 times higher than for cleaned Nb Imax=50 nA demonstrated QEmax=9.0E-5 06.07.11 QEmax=3.6E-5 16.06.11 HZB data for QEmax J.Smedley, PRST-AB 11, 013502 (2008)

  14. Phase scan Epeak=12 MV/m tlaser(FWHM)=2ps Epeak=18 MV/m; 10 degr. 0.45 pC FWHM~0.9 ps Epeak=18 MV/m Epeak=18 MV/m tFWHM=2.6 ps

  15. Phase scan To the first order approximation, QEmetal near photoemission threshold can be expressed as

  16. Dark current bE0 Time averaged field emission current E0 oxides/carbides • field enhancement factor: • ideal surface field E is increased to a local microscopic field Em: b=Em/E Epeak=17 MV/m emission around 900 launch phase Epeak=15 MV/m

  17. Dark current bE0 Time averaged field emission current E0 oxides/carbides • field enhancement factor: • ideal surface field E is increased to a local microscopic field Em: b=Em/E Fowler-Nordheim plots for 1.6 cell SRF gun with Pb cathode b=540 b=230 b=180 β was calculated for =4.0 eV

  18. This work is a collaborative effort by: W. Anders, R. Barday, A. Jankowiak, T. Kamps, J. Knobloch, O. Kugeler, A. Matveenko, A. Neumann, T. Quast, J. Völker, Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Berlin, Germany J. Sekutowicz, DESY, Hamburg, Germany J. Smedley, BNL, Upton, Long Island, New York, USA P. Kneisel, JLAB, Newport News, Virginia, USA R. Nietubyc, The Andrzej Soltan Institute for Nuclear Studies, Swierk/Otwock, Poland J. Teichert, HZDR, Dresden, Germany

More Related