An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Commissioning Results of the DØ Tracking System • Design • Installation and Commissioning • Tracking/Vertexing Results Harald Fox Northwestern University May 24, 2002

  2. Chicago  p p 1.96 TeV Booster p CDF DØ Tevatron p p source Main Injector & Recycler The Fermilab Tevatron Collider H. Fox

  3. The DØ Detector Calorimeters Tracker Muon System protons Beamline Shielding 20 m Electronics antiprotons H. Fox

  4. Tracker Design H. Fox

  5. SMT Design 12 F Disks 4-layer barrel cross-section 4 H Disks 6 Barrels H. Fox

  6. SMT Design • Require good 3D track reconstruction performance for high-pT (top, Higgs, EW, NP) and low-pT (B) tracks out to || < 3 • Momentum resolution less than 10% at pT = 1 GeV/c • Impact parameter resolution within 30 m • Forward H disks are employed to achieve these resolutions at high || H. Fox

  7. Analog section Digital section Pipeline Control Logic Analog Pipeline: I/O To Silicon Detector Sparsification FIFO ADC Comparators 128 Integrators To Readout System 128 channel ADC ramp and counter 32 cells SMT Readout Electronics • SVX IIe Chip • 128 channel, 32 pipeline cells • 8 bit ADC with sparsification • 106 MHz digitization, 53 MHz readout • Radiation hard • Developed by LBL/Fermilab group • Interface Boards • Refresh signals and adjust timing • Power management and monitoring • SEQencers • Management of SVX • Conversion to fiber optics • VRB (VME Readout Buffer) • Data buffer pending L2 trigger decision • ~ 50 Mb/s/channel • 5-10 kHz L1 accept • 1 kHz L2 accept rate H. Fox

  8. 8 layers of axial and 3° stereo fibers mounted on carbon fiber support cylinders. 20cm < r < 51cm. 76,800 individual fibers. Diameter: 835μm. Length: 1.8/2.6m. The interlocked fibers are precisely positioned. Hit resolution about 100μm. CFT Design H. Fox

  9. ~8-11m long wave-guides to Visible Light Photon Counter (VLPC, solid state photo multiplier). VLPCs are operated at 9K. Quantum efficiency: 80%. 1 mip ~ 8 photo electrons:  Excellent S/N! LED Calibration 0 pe 1 pe 2 pe 3 pe 4 pe CFT Readout Electronics • High gain: 17k – 65k e per photon • AFE boards provide • Bias voltage • Temperature control • Fast digital trigger information • Analog pulse information (SVX) • SEQ + VRB readout as SMT H. Fox

  10. Installation SMT cylinder • Fiber tracker installation • Cylinder installation was completed on 12/20/00 • A ½ cylinder of 3 barrels and 6 F disks was inserted into each end of the CFT bore • H Disk installation was completed on 2/6/01 • The cabling (~15,000 connections) and electronics installation was completed in May 2001 • Axial Fiber Tracker electronics installed in November 2001 • Stereo electronics completed April 2002 Interface Boards High Mass Cables Low Mass Cables SMT Calorimeter Cryostat with AFE boards Wave guides H. Fox

  11. n-side pulse-height (ADC) p-side pulse-height (ADC) p-side pulse-height (ADC) fraction of 1 strip clusters Local track incidence angle SMT Charge Collection Charge correlation between p- and n-side of a detector • Cluster charge (corrected for track angle): 1 mip ~ 25 ADC counts. Noise < 2ADC counts. φL =4.5° Lorentz angle: The charge deflection due to the magnetic field H. Fox

  12. CFT Commissioning Zee candidate event. Mass 89.9GeV/c2 Light yield per sector vs pseudorapidity η H. Fox

  13. CFT track SMT track y track x Tracking and Vertexing CFT-SMT track matching Impact parameter resolution Vertex measurements DCA H. Fox

  14. Wen candidates ET(cluster)/pT(track) Physics Results E/p for Weν candidates Z  μ+μ- cand. KS π+π- cand. J/Ψ  μ+μ- candidates First evidence for B decays H. Fox

  15. Conclusions • Design • The DØ tracking detectors are designed to have a good impact parameter resolution over a wide range of η. • Commissioning • The SMT was the first major DØ Upgrade detector system fully operational for Run 2A. • About 95% of the channels are available for readout. • Results • Calibration, beam measurement, and alignment results are looking promising. • Physics results coming in. • Noise studies, tracking refinements, etc. continue. H. Fox

  16. The DØ Collaboration The work of many people...…thanks to all of them. H. Fox

  17. Lorentz angle • Lorentz angle is different for p- and n-sides • Lorentz shift is not visible for 90 deg stereo strips • Lorentz shift is large for 2 deg stereo • Lorentz angle can be measured in local phi distribution for one strip clusters • Measurement is NOT affected by alignment or reconstruction P-side (axial) Phi distribution for one strip clusters h+ e- Data p-side H. Fox

  18. SMT Design: Stereo Angles • Ladders • 3-chip: 72 single-sided, axial ladders in the two outer barrels • 6-chip: 144 double-sided, axial/90° ladders in the four inner barrels • 9-chip: 216 double-sided, axial/2° ladders in all barrels • Wedges • F Disks: 144 double-sided, ±15°, 6+8 chip wedges • H Disks: 96×2 back-to-back single-sided, ±7.5°, 6 chip wedges 9-chip ladder H wedge H. Fox

  19. Production & Assembly: Testing • Probe Test • Debug bad strips (broken capacitors), bonds, chips, etc. • Determine the V-I characteristics of the sensors • Measure V-max p-side breakdown voltage (micro-discharge effect) • Burn-in • Bias the ladder or wedge and test the readout for 72 hours • Measure pedestals, noise, gain and check sparse readout • Laser • Expose biased detectors to a narrow laser scan • Measure the depletion voltage and leakage currents and identify dead channels • Readout tested again after the detector has been mounted. V-max Fail H. Fox

  20. SMT Readout: Data Flow HV / LV I,V,T Monitoring 8’ Low Mass Cable ~19’-30’ High Mass Cable (3M/80 conductor) 25’ High Mass Cable (3M/50 conductor) 3/6/8/9 Chip HDI KSU Interface Board CLKs CLKs Adapter Card SEQ SEQ SEQ Sensor SEQ Controller Optical Link 1Gb/s Detector volume Platform Serial Command Link VRB VRB VRB VBD 68k/PwrPC 1 5 5 3 VRB Controller Bit3 VME PC MPM L3 Counting House SDAQ H. Fox

  21. Alignment: Residuals • SMT-only tracking with at least 4 hits • Magnet off data • Similarity of residuals from reconstruction with ideal and survey geometries indicates excellent internal alignment of the SMT Ideal Geometry Survey Geometry H. Fox