sLHC sensor R&D • Module Plans (Nobu) • Manufacturing plans, including financing (Nobu) • Sensor Specs (Nobu) Y. Unno, 2007/2/26
Masks are done Fabrication is on-going p-FZ(100) p-MCZ(100) 3 wafers each Delivery April Irradiation End April 70 (or 80) MeV p ATLAS06J fabrication Y. Unno, 2007/2/26
150mm wafer p-FZ(100) n-strip isolation Individual p-stop 4 segments SS: as is LS: wire-bond segments ATLAS07 Y. Unno, 2007/2/26
Stereo? Y. Unno, 2007/2/26
Edge stereo connection Y. Unno, 2007/2/26
ATLAS07 specification Y. Unno, 2007/2/26
Design 2 months+? by May? Fabrication a few months depends on quantity Financing Mask cost to be shared No. wafers=Cost share Invoices Japan: KEK Outside Japan: CERN TID My big question mark Readout ASIC? Irradiation campaign CYRIC (70-80 MeV p) (April), Aug, Nov,Mar PSI (pions) Neutrons Dummy ATLAS07 Al metal only Who are interested? How many? Financing withsame model ATLAS07 Y. Unno, 2007/2/26
2007 3-5 Design of pre-prototype (Barrels) 2007 6-9 Fabrication of pre-prototype 2007 9- Irradiation, Module fabrication and evaluation 2008 3-6 Design of prototype (Barrels, Endcaps) 2008 6-10 Fabrication of prototypes 2008 10- Irradiation, Module fabrication and evaluation, beamtests 2010 2 TDR ATLASxx plan Y. Unno, 2007/2/26
1-MeV neq /cm2 Fluence by particles Sensor parameters for ASIC Y. Unno, 2007/2/26
Constraint from HV cable rating 500 V (1 kV tested) Sensor operation <500 V Parameters for ASIC at 500 V Preliminary Sensor parameters for ASIC Y. Unno, 2007/2/26
Preliminary!!! Sensor parameters for ASIC Y. Unno, 2007/2/26
Modules have to have ABCN when? hybrids develop along with ABCN fabrication of modules time scale uncertain Staves ? Module plan Y. Unno, 2007/2/26